Central Artery (I-93)/Tunnel (I-90) Project
This paper is intended to provide an overview of the Boston Central Artery/Tunnel Project (CA/T) Project; a $4.9 billion USD interstate highway constructed underground through a densely...

Immersed Tube Tunnel, Boston, Massachusetts
A four-lane Immersed Tube Tunnel is planned for the crossing of Boston Harbor from the City of Boston to the Logan Airport area in East Boston. The immersed tube consists of 12 sections...

Water Resources Planning and Management and Urban Water Resources
This proceedings, Water Resources Planning and Management and Urban Water Resources, contains papers presented at the 18th Annual Conference...

Economic Impact of Earthquake Effects on the City of Everett's Lifelines
The economic effects of lifelines failures, caused by three hypothesized earthquake scenarios, in the city of Everett, Washington are estimated. The project team consists of lifeline seismic...

Cross-Impact Analysis for Lifeline Interactions
A probabilistic method to evaluate the seismic risk of urban lifeline network systems is presented with emphasis on the interactive aspects of lifeline earthquake disaster. First, the...

Fuzzy Reasoning for Earthquake Damage Assessment of Large-Scale City Gas Systems
A method for earthquake damage assessment is proposed for a large-scale city gas system. Since lifeline systems are usually laid in a large area and are composed of a number of component...

Seismic Design Criteria for Transportation Structures
Seismic criteria for the design of transportation stuctures have evolved slowly since their inception in the early 1940s. Although seismic design criteria are far more sophisticated than...

Preliminary Earthquake Mitigation Planning to Improve Watermain Performance in Vancouver, B.C.
City of Vancouver's water transmission and distribution system is vulnerable to over 1,000 pipe leaks or main breaks from a probable large earthquake (about 7.5 M). Cast iron...

Bridge Damage Review?Loma Prieta Earthquake
The Loma Prieta Earthquake that struck the San Francisco Bay Area on October 17, 1989 caused varying degrees of damage on highway bridges. Within a few hours of the event CALTRANS had...

Inductive Loop Detection/Testing with DSP Techniques
Vehicle traffic control is recognized as an effective way to relieve mounting traffic congestion in large urban areas across the country. The most common method of vehicle detection is...

A Preliminary Systems-Level Evaluation of Automated Urban Freeways
Transportation planners predict that traffic congestion will increase dramatically in the future. With 63% of all congestion on urban freeways, much of it in high-density areas, traditional...

Bus Pre-Emption: A Real Time Control Strategy for Privatized Transit Operation
Bus pre-emption strategies are designed to provide priority to transit buses over passenger cars for urban travel. A comparative analysis of a proposed suburban bus service for regular...

Observation and Modeling of Mobile Environment
Perception of the environment in a mobile robot is a difficult task. Other moving objects and various changes in the environment and motion of the robot must be handled together. Control...

Full Use of Waterfront in Wakayama Marina City
At Wakanoura Bay, in the center of Wakayama Shimotsu Port, Wakayama Marina City Project has been under construction. This project is expected to play a leading role in the development...

Case Study?San Francisco South Beach Harbor
In October, 1986 San Francisco's newest recreational boat harbor, South Beach Harbor, opened for business. This event was preceded by ten year's of planning for...

A New Approach to Waterfront Development and Use Control
One of America's most significant waterfront communities is faced with complex problems regarding the preservation and enhancement of its maritime and waterfront heritage....

Racine's Reefpoint Marina and Festival Park?Sustaining Success Along the Lakefront
Racine County, Wisconsin, is a lakefront county os 173,000 residents located along the southwestern cost of Lake Michigan. A waterfront revitalization program, begun in 1982, has produced...

Marinas and Waterfront Redevelopment, Brisbane
This paper describes a selection of marina projects which are being developed at locations of abandoned commercial wharves in the Brisbane River, and the impact of this transformation...

Environmental Processing of a Mixed Use Marina Project
The environmental review process associated with the review and approval of mixed use development in water front areas can be used to aid in the design, approval and ultimate construction...

Riverbank Renewal
In Providence, project teams from the public and private sector worked side-by-side, rerouting two rivers and constructing a new corporate headquarters. What made the task more challenging...

 

 

 

 

Return to search