Computer Simulation Modeling of Ebb-Tidal Deltas
An ebb-tidal delta simulation model has been developed incorporating gross features of delta and channel morphologies which can be measured from vertical aerial photographs. Delta and...

Processes of Shoreline Change Along the Nile Delta Coast of Egypt
A comprehensive program has been underway for more than a decade to collect nearshore data related to erosion problems experienced along the shoreline of the Nile Delta. The data include...

Numerical Modelling of Lower Lias Rock Failures in the Coastal Cliffs of South Wales
A model has been developed to evaluate slope failure in the interbedded limestone and mudstone Lower Lias series which outcrop for some 30 km in coastal South Wales. Computer simulation...

Beach Profile Modelling: Flume Data Comparisons and Sensitivity Tests
Some results from a deterministic computational model of beach and nearshore profile development are presented in this paper. Comparisons are made with prototype-scale flume measurements...

Higher Frequency Acoustic Measurements of Coarse Bedload Transport
Although sensors have been developed which provide high temporal resolution for the measurement of wave profiles, flow fields and suspended sediment concentrations within the coastal system,...

Standing Wave Measurements of Bedload Thickness: Feasibility in an Air System with Model Sediment
A novel technique would yield information about bedload thickness from measurements of a standing wave pattern produced by a sound source insonifying the bottom at normal incidence. The...

Permeability of Cement Grout Plugs in Basaltic Rocks
Flow tests have been conducted on expansive cement grout plugs with diameters of 160 mm and 200 mm, and length-to-diameter ratios of one, in boreholes in basalt blocks, and in steel pipes....

Pressure-Time Flow Measurements Under Adverse Conditions
Theoretical analyses suggest that the pressure-time method is capable of accurately determining flow rate in the short, varying cross section, 'semi-scroll' penstocks...

Measurements of Time Lag in Concrete Gravity Dam Foundations
Uplift measurements from eight large concrete gravity dams show that the time lag between an increase in headwater level and a corresponding increase in uplift pressure is insignificant....

Three Dimensional Modeling of Concrete Dams with Cracks Using Boundary Element Methods
Determining uplift pressure distributions in cracks in a concrete dam requires coupling between crack hydraulics and the stresses and displacements occurring in the rock and the concrete...

Avoiding Vibration in Penstocks
One objective of this paper is to indicate the potential sources of pressure pulsations within a hydraulic conduit system and the range of forcing frequencies associated with these sources....

Field Tests of a Lewiston Pump-Generating Unit
An extensive field test program was undertaken on a Lewiston Pump-Generating Plant (LPGP) unit at the Niagara Power Project, owned and operated by the New York Power Authority. The objective...

Frazil Ice Problems and Solutions at Hydro-Power Intakes
Active and passive frazil ice effects on hydroelectric plant intake design and operation are described and references are provided. The most frequently encountered problems and the basic...

Pressure Control Studies for PG&E's 20 MW Grizzly Hydroelectric Project
The Pacific Gas and Electric Company's Grizzly Hydroelectric Project consists of a single 20 MW Francis turbine under 700 feet head located near the existing Bucks Creek Project....

The Twin Vortex Draft Tube Surge
Recent studies conducted at Colorado State University using a model of the 700-MW turbines at the U.S. Bureau of Reclamation's Grand Coulee Third Powerplant indicate that...

Performance Analysis of Multipath Acoustic Flowmeters Under Various Hydraulic Conditions
Multipath, crossed plane acoustic flowmeters are being increasingly used for hydroelectric turbine efficiency measurement both for acceptance testing and efficiency mapping of units in...

Pressure-Time Method Using Modern Practices
Over the past twenty years, Hydro-Quebec has modernized the pressure-time method of flow measurement, a method which is generally economical but sometimes difficult to apply. Starting...

Some Unusual Vibrations in Hydro Machinery
Most hydro machinery engineers have read the textbook cases of self-exited and flow induced vibrations. Usually such textbook vibrations are only found in the text book! In the real world,...

Application of Personal Computers to Field Flow Measurement
Flow measurements are often necessary to verify the performance of hydro turbines for regulatory, contractual, or engineering purposes. Historically, several methods utilizing various...

History of Lysimeter Design and Use for Evapotranspiration Measurements
Lysimeters are devices for measuring percolation of water through soils and sampling soil water for chemical analyses. Lysimeters have been used for over 300 years to determine water use...

 

 

 

 

Return to search