Optimum Operation of Recharge Basins
Mathematical models based on nonlinear programming are developed for operating recharge basin systems. The objective of these optimization models is to determine the operation policy that...

The Strategic Development of a Sole Source Aquifer to Improve Water Quality While Minimizing Environmental Impact
A water supply project is currently underway which prevents future degradation of a sole source aquifer while providing a groundwater resource with limited usage restrictions. Salt water...

Large-Scale Conjunctive Use of the San Gabriel Basin: An Environmentally Beneficial Water Supply Project
The 170-square-mile San Gabriel Basin in Los Angeles County, California, has commanded the attention of both water supply and environmental agencies because: (1) it is an idyllic natural...

Upper Guadalupe River Authority, Texas?Innovative Solution to Long-Term Water Needs
Through conjunctive use of groundwater and surface water, the Upper Guadalupe River Authority (UGRA) has designed a water supply system for the City of Kerrville, Texas that saves 80 percent...

Small Area Water Demand Forecasting at the Salt River Project
The Salt River Project Small Area Water Demand Forecast (forecast) is designed to provide water resource planners with long-range water demand forecasts disaggregated by user type and...

Residential Water Conservation and Reuse Demonstration: Casa Del Agua and Desert House
Occupied single-family homes can provide factual data as well as create an active real-world setting for education of the public. The installation of water-efficient fixtures, rainwater...

Agricultural Water Conservation Programs to Improve Water Use Efficiency
California's growing population poses an ever increasing demand for water from the existing limited and scarce water resources of the State. In addition the continuation of six years of...

Impact of Groundwater Management Act and CAP Water Supply on Agricultural Water Conservation Programs
Irrigation districts in central Arizona have increased the tax assessments for their farms to pay for distribution systems to deliver Central Arizona Project (CAP) water. Many farms must...

Design of Aquatic Treatment Systems
This paper describes the design parameters and operating procedures used for a nonpoint pollution/stormwater treatment facility known as an Aquatic Treatment System to be located in the...

The Fairfield-Suisun Urban Runoff Management Program: The Approach of Small Communities to NPDES Permitting
The Fairfield-Suisun Sewer District is responsible for NPDES permit acquisition and maintenance of the storm drainage facilities of the Cities of Fairfield and Suisun City, California....

When the Well Runs Dry Paying for Storm Water
Much will be said during this conference about the need for various structural and nonstructural approaches toward mitigating problems related to storm water quality and quantity management....

Case Study: Storm Water Analysis of Manatee Pocket in Martin County, Florida
storm water pollutant loading rates from a 6,000 acre urban watershed were analyzed for source determination of contamination to the receiving water. The receiving water body, Manatee...

Managing Stormwater with a Microcontroller Operated System
Concepts of managing urban stormwater runoff with a microcontroller operated flow control system are presented. The microcontroller system allows flexible and precise flow control from...

Urban Runoff and the Environment
This paper discusses complex water quality problems, including management of urban runoff. Mathematical modelling is used to asses runoff quantity and quality. Environmental impact...

Projecting Customers Using a GIS Land Use Forecasting Model
The Salt River project originally developed the Land Use Forecasting Model to understand the pattern of urbanization of agricultural and desert land in metropolitan Phoenix. The model...

Resource Leveling Based on the Modified Minimum Moment Heuristic
CPMLevel is an MS Windows computer program that utilizes the minimum moment algorithm to smooth the histogram of a resource in both traditional and overlapped CPM networks. It has interactive...

Optimal Resource Leveling Using Integer-Linear Programming
The project manager strives to schedule various project tasks as efficiently as possible. But, resources available to the project manager are limited. A problem arises when a schedule...

Adaptive, Multi-Resolution Modeling of Construction Plans
The process of developing a construction plan is complex, taking many considerations and constraints into account. In contrast, the CPM paradigm of planning allows only the results of...

Exchanging Layout and Schedule Data in a Real-Time Distributed Environment
Unpredictable site conditions and unforeseen changes in construction work may result in inefficiencies due to a shortage of work space and difficult access to critical areas on site. This...

Automated Total Quality Management for the Constuction Industry
This paper describes the design of a computer system, called the Total Quality Management system (TQM), to integrate a Quality Assurance (QA) management system with time and resource management...

 

 

 

 

Return to search