Hydraulics of Enlarging Cannonsville Reservoir
This paper describes the hydraulic studies performed for enlarging the Cannonsville Reservoir with a gate system which could raise the normal storage level without having an adverse effect...
Flood Operation Studies of the Valdesia Reservoir System in the Dominican Republic
The Valdesia reservoir system, located on the Nizao River in the Dominican Republic, is designed to provide irrigation water to the Nizao project areas and hydroelectric energy to the...
A Probabilistic Method for Determination of the Required Capacity of Reservoirs
Evaluation of water supply potential of multi-purpose dams generally involves determination of the required capacity of reservoirs for new dams and analysis of safe yield or reliable yield...
Real-Time Hydrologic Modeling
The Huntington District of the Corps of Engineers is currently using daily computer modeling for guidance in regulating all nine of its major river basins. Both pool elevation and flow...
Multiple Parameter Rule Curve for Reservoir Operations
A procedure for deriving operations rules for water supply storage in a multipurpose reservoir, based on physical principles and data analysis, is described. This procedure has several...
A Real-Time Flood Management Model for River-Reservoir Systems
A flood forecasting model has been developed for the Lower Colorado River Authority that can be used in a real-time framework to make decisions on reservoir operations during flooding....
ESOLIN: A Model to Optimize Water Resource Systems
ESOLIN is a simulation model designed to study and optimize the development and operation of large hydro resource schemes. It was developed as a tool for the development of large hydro...
Criteria for Selecting a Reservoir Routing Method
Results of an investigation comparing dynamic and storage reservoir routing applied in dam safety analyses are presented. Outflow hydrographs computed by these reservoir routing methods...
Time-Domain Dam-Reservoir-Interaction Analysis Based on Boundary Elements
For a reservoir with an arbitrary shape of the upstream face and of the bottom including an adjacent regular part of constant depth extending to infinity, the hydrodynamic-stiffness matrix...
A Stochastic-Conceptual Reservoir Inflow Forecasting Model
The development of a method to improve real-time forecasting of reservoir inflows for the purpose of minimizing water loss through spillage is presented. Streamflow forecasts are computed...
Ruedi Dam Hydropower Project
The Ruedi Dam & Reservoir is owned and operated by the Bureau of Reclamation, U. S. Department of the Interior and is part of the Fryingpan-Arkansas transmountain diversion development....
Planning and Designing the Powerplant at Stampede Dam
Power development at Stampede Dam was complicated due to the uncertainty about future reservoir operation and the need to design for seismic risk while attempting to minimize overall cost....
Calaveras Pipeline Hydroelectric Project
The Calaveras Public Utility District (San Andreas, California) has a pipeline connecting its water treatment plant to the San Andreas Reservoir. By reducing the flow rate in the system...
Power Development at Buffalo Bill Dam
Buffalo Bill Dam is on the Shoshone River in northwestern Wyoming near the city of Cody. The dam is a 325-foot-high concrete arch facility with a crest length of 200 feet. The dam was...
Hoover Dam Earthquakes Reconsidered
In 1936 and 1937 as the water rose behind Hoover Dam, earthquakes were felt in the Boulder City area and as far away as Las Vegas. Interest in induced seismicity was renewed in 1967 with...
Rapid Filling of Reservoirs
The rate of filling a reservoir, particularly for the first time, is governed by various factors. While economic considerations may favor rapid filling of reservoir to operational levels,...
Oxygenation of Releases from Richard B. Russell Dam
In July 1972, the Georgia Department of Natural Resources requested the formation of a technical committee to analyze the water quality matters relating to the Russell project. Studies...
HYPOS?Hourly System Hydropower Scheduling
HYPOS (Hydro Power Scheduling) is a modification of the program HYPO as presented at Waterpower 81. HYPOS is an interactive system which allows schedulers to assign hourly power generation...
Hourly Scheduling Model for Multi-Unit Hydro Facilities
A computer model for determining hourly releases and generation for multi-unit hydropower facilities is described. The purpose of the model is to disaggregate daily release volumes (either...
Impacts of Indexed Sequential Hydrological Modeling on Hydrogeneration Capacity Estimation
Indexed sequential modeling (ISM) has been proposed by the Western Area Power Administration as an alternative approach to developing firm marketable capacity (i. e. , project dependable...