Addressing Central Valley Project Policy Issues Using a General-Purpose Model
The U.S. Bureau of Reclamation's Central Valley Project (CVP) in California is constantly undergoing changes in legal mandates and policy objectives. Due to the complex nature of existing...

Joint Optimization of Groundwater Remediation and Monitoring
We describe the challenge of devising optimization methods which optimize jointly the remediation and monitoring at a contaminated site. We refer to the dual control method as a promising...

Simulating Hourly Hydropower Operations for the Assessment of Environmental and Economic Impact
Generation of peaking power at Glen Canyon Dam causes river flow and stage to fluctuate on an hourly basis. This has been shown to impact the downstream physical and biological environment....

Integration of Water Rights and Network Flow Modeling in the Upper Snake River Basin
The U.S. Bureau of Reclamation's Pacific Northwest Region and Denver Office are working to enhance the ability to integrate hydrological and institutional modeling capabilities for use...

PROSIM - A Water Rights-Based Operational Simulation Model of the Provo River
The development and initial application of a computer model of the hydrology, water rights, and operation of the Provo and Weber rivers in Utah are described. The new FORTRAN model PROSIM...

Predicting Hydrologic Impacts of a Severe and Sustained Drought on the Colorado River Basin
We investigated the impacts of a severe and sustained drought (SSD) on the hydrology of the Colorado River Basin. The simulation was carried out using the Colorado River Network (CORN)...

Economic Impacts of Severe and Sustained Drought
A hydrologic-economic-legal impact model shows that a severe and sustained drought in the Colorado River Basin would cause acute economic damages to most instream water users, and to upper...

Missouri River Economic Impacts Model
The Missouri River basin recently (1987-1992) experienced a drought that affected project uses and environmental resources. This drought and the need to address changes that have occurred...

Stochastic Optimal Control for Determination of Freshwater Inflows to Estuaries
The objective of the research is to develop estuarine system management models based upon discrete-time stochastic optimal control. An analytical feedback control law is given. The control...

Multiobjective Models for Determining Freshwater Inflows to Bays and Estuaries
This paper presents four multiobjective models for the estuary management problem, including goal programming, the epsilon constraint method, the surrogate worth tradeoff method and the...

Development and Application of Long Range Study (LRS) Model for Missouri River System
The Long Range Study (LRS) Model is a simulation model developed in the 1960's develop and test criteria for operation of the Missouri River mainstem reservoirs through an extended period...

Computer Simulation Model of the Integrated Local Water Supply Plan for the City of Wichita, Kansas
The City of Wichita, Kansas will require additional water supply sources to meet projected future water demands. A study of options identified a supply plan with integrated use of local...

Development of a Wetland/Riparian Resource Model for the Missouri River System
Wetlands and riparian areas are significant resources along the Missouri River, providing important fish and wildlife habitat. These resources required evaluation as part of the review...

Missouri River Least Tern and Piping Plover Model Development
As part of the update of the Missouri River Master Water Control Manual, the U.S. Army Corps of Engineers is evaluating the effects of numerous water management alternatives on endangered...

Development of Environmental Impacts Model for Missouri River System
The Corp of Engineers is reviewing the Missouri River Master Water Control Manual with the goal of determining the best plan for the Missouri River Basin. The Environmental Impacts Model...

Determining Optimal Parameter Dimensions for Water Distribution Network Models
Water distribution systems contain a large number of pipes whose roughness factors are unknown prior to model calibration. During the calibration process, pipe roughnesses for each link...

WATSUP: A Simulation Model for Water Supply Cost and Reliability
WATSUP (Water Supply) is a computer model developed to provide a prototype modeling tool for planners to estimate the costs and reliability of urban water supply systems on a regional...

Evaluating the Steady State Stochastic Dynamic Programming Model for the High Aswan Dam
The paper describes the results of a study to critically evaluate and test the Steady State Stochastic Dynamic Programming model (SSDP). Whenever a reservoir computer model is developed,...

Wet Detention Facility Pollutant Removal Modeling
This paper documents development of the WETPOND model, which simulates long-term pollutant removal by a wet detention facility. Pollutant removal is determined with an EPA procedure that...

Reliability Analysis of a Multi-Reservoir Water Distribution System
A methodology for evaluating system reliability is developed to assist in the planning and management of a multi-reservoir water distribution system. The minimum cut-set approach is employed...

 

 

 

 

Return to search