Westway - The Little Word that Killed the Big Highway
The Westside Highway Project, better known as Westway, received a construction permit on February 25, 1985 from the Army Corps of Engineers. Signed by the author, the permit was invalidated...
Techniques for Rapid Assessment of Seismic Vulnerability
Under the impetus of a growing awareness of seismic hazards, there is an increasing effort being devoted to assessing the seismic vulnerability of existing buildings. For many professionals...
The United States Used to be a Great Country...
Up until 20 years ago, the American highway departments did a good job of maintaining bridges and they kept streets well paved. The public works departments maintained the water and sewer...
The Impact of Selected Sea Level Rise Scenarios on the Beach and Coastal Structures at Sea Bright, N.J.
The physical impacts of selected sea level rise scenarios on the shoreline of Sea Bright, New Jersey, are investigated. The sea level rise scenarios chosen for investigation were developed...
Cultivating Community Confidence?The Key to Success or Failure
A successful community participation program proved to be the turning point for federal approval of the Buffalo, New York rapid transit project. This paper details that citizen involvement....
Project Management for the Upper Harlem Electrification Project
The Upper Harlem Electrification Project consists of a 28 mile extension of 700 V. D. C. under-running third (current carrying contact) rail electrification from North White Plains, New...
Bridge Inspection by Dynamic Loading Technique
This paper describes, a case study of the evaluation of the structural integrity of a New York State Thruway bridge using the dynamic loading technique. The study was undertaken in a effort...
Acid Deposition in the Wind River Mountains
National attention has been focused on the discovery of acidified lakes in the Adirondack Mountains of New York and elsewhere in New England. It is commonly believed that the West, in...
Seepage Control at Cochiti Dam, New Mexico
Significant design data, design assumptions and computations, and performance of the seepage control features provided at Cochiti Dam are summarized in this paper. The dam is a rolled...
Highway Noise: FHWA Requirements and Barrier Design
Since 1973, the Federal Highway Administration (FHWA) has required noise studies for nearly all proposed roadways and roadway improvements that receive federal aid. An overview of these...
A Case Study - Toms River Water Company, Toms River, New Jersey
Toms River Water Company provides water service to Dover Township, the Borough of South Toms River and portions of Berkeley Township, all in Ocean County, New Jersey. Existing supply facilities...
Computerized Design and Selection of Pumping Systems
Three computer models have been applied in the evaluation, design and selection of a high-lift pump station upgrading program developed for the City of Poughkeepsie, New York. The three...
Application of Phosphorus Models to New Mexico Reservoirs
Many empirical, mass-balance phosphorus models have been developed and tested on northern, temperature lakes and previously published. Fourteen of those published models were tested on...
Ground-Water Flow Model of Soda-Ash Waste Beds
A recent application by a steel manufacturing plant to obtain a permit for an industrial landfill located on top of abandoned soda-ash waste beds in the City of Syracuse, New York, resulted...
Emerging Environmental Clean-Up Responsibility
This paper is a summary of the structure of regulations requiring clean-up of sites when closed or sold, specifically the State of New Jersey's Environmental Cleanup Responsibility...
The Environmental Assessment Process at the Municipal Level in New Jersey
It is shown that there are many complex interactions that often affect the review process associated with environmental assessments in the State of New Jersey and probably in other states...
Hazard Assessment of Landfill Fire Air Emissions
The PJP Landfill, located in northeastern New Jersey, is a suspected hazardous waste site, and is listed on the federal Superfund National Priorities List. In addition to contaminating...
Sludge Treatment Design Lands Innovative Funding
The design of sludge treatment facilities for the 10 mgd Ithaca, New York, wastewater treatment plant incorporates both proven technology in the form of gravity thickening and anaerobic...
Effect of Santa Rosa Lake on Ground Water Flow to the Pecos River, New Mexico
In 1980, Santa Rosa Dam began impounding water on the Pecos River about 7 miles (11 kilometers) north of Santa Rosa, New Mexico, to provide flood control and storage for irrigation. Santa...
Fishery Mitigation in an Estuarine Environment
This paper summarizes the major features of the estuarine mitigation plan proposed by New York State Department of Transportation in conjunction with the interstate highway project known...
Return to search