Monte Carlo Approach to Spillway Design Floods
This paper shows the use of a daily stochastic streamflow model for the calculation of the hydrograph for spillway design. Most of the literature related to the topic deals with the problem...

A New Method for Synthesizing a Six Hour Unit Hydrograph
A new methodology was devised that would use readily available basin physical parameters for the determination of unit graphs in undeveloped and ungaged areas. Rather than using small...

Time Base of a Hydrograph
For design projects in water resources, a hydrograph is commonly used to determine the required flood volumes. The time base of a hydrograph is a crucial parameter in such studies, and...

Fault Identification by Seismic Impact Load Techniques
The propagation of seismic waves generated by impact loading across a normal fault in carbonate rock was investigated by the seismic refraction technique. The field records were reduced,...

Activity Center Development Impact Analysis
A flexible microcomputer spreadsheet analysis method is described for analyzing area-wide and localized impacts of new development in urban or suburban activity centers. The analysis approach...

GTRAF: The Netsim Graphics System
This paper describes the development of an interactive computer graphics (ICG) system, named GTRAF, which will provide users with a new and highly efficient methodology for analyzing results...

Development of Graphics Displays for the Integrated Traffic Data System
This paper describes the development of interactive graphics displays for the Integrated Traffic Data System (ITDS) and provides technical details on the hardware and software considerations...

Spreadsheet-Based Queuing Models
This paper describes how microcomputer-based spreadsheet programs, such as Lotus 1-2-3, can be used to implement queuing models of varying levels of sophistication for use in traffic analyses....

Freeway Analysis Using A Micro Version of FREQ
FREQ8PE is a freeway corridor simulation model. It is a batch processing mainframe program written in ASCII FORTRAN IV, which performs three basic functions: simulate freeway queueing,...

A Decision Support System for Freeway Corridor Analysis
When the scope of a particular corridor study dictates the review and analysis of a relatively large number of road segments along major transportation corridors, the integration of roadway...

Traffic Engineering Data Collection Using Custom Equipment and Microcomputer System Equipment and Procedures
This paper presents experience with various traffic engineering data collection equipment and devices. It presents criteria for the development of a general purpose data collection system....

ROADTEST?A Microscopic Traffic and Transit Simulator
A new computerized microscopic traffic simulation model ROADTEST is described. The model a general purpose one, permits simulation of any vehicles including trains and fixed route transit...

Trip Table Estimation from Observed Traffic Volumes
This estimation technique identifies the most likely trip table to produce a specified set of traffic counts when assigned to a representative highway network. The resultant table is derived...

County-Level Planning Model in Atlanta Region
Gwinnett County is working with the Atlanta Regional Commission (ARC) and Barton-Ashman Associates to download the ARC trip tables for use in a microcomputer transportation planning model...

Traffic and Transport Data Management by Micro-Computer
Dealing with the multiple needs of an adequate traffic and urban transport information system is becoming a manageable task with the software and hardware presently available in micro-computing....

Simulation of Intersections During Reconstruction
In order to make computer simulation of intersections more appealing and easier to use, and interactive, menu-driven micro-computer program, called INTERCON (Michalopoulos and Plum, 1986),...

The Wet Look
The collapse of the Schoharie Creek bridge drew attention to underwater inspection. Underwater inspection of bridges gives engineers a better understanding of the condition of the bridges....

Surveying for Scour
The public works engineer never knows exactly how many bridge piers and abutments are undermined by erosion due to scour. Massachusetts Department of Public Works needed a rapid method...

Beyond Digital Mapping
Northern Ireland, small and compact, geographically well defined with a relatively simple administrative structure, is able to establish a comprehensive Geographic Information System (GIS)...

Study of River Stage Fluctuations Resulting from Possible Operations of the Susitna Hydroelectric Project
Operation of the project to follow load may result in discharge and river stage fluctuations which could affect habitats and fish food sources. Limitations on hourly, daily, and weekly...

 

 

 

 