Rocky Mountain Project?Probable Maximum Floods
Probable maximum floods (PMF's) were estimated for use in designing spillways for the lower reservoir main dam and two auxiliary pool dams at the Rocky Mountain pumped-storage...

Utilizing Wetlands for Stormwater Retention
The design steps an engineer uses to develop natural wetlands to provide flood control while continuing to retain their natural functions will be analyzed. This paper will include a discussion...

Case Study: Steele Creek Dam Safety Analysis, Bristol, Tennessee
Steele Creek Dam creates a small recreational park lake before discharging into Beaver Creek a few hundred yards below the dam. Existing homes and trailers downstream from this junction...

Examples of Risk Assessment in Dam Safety Decision Making
Three examples of risk-based dam safety evaluations performed for dam users or operators are summarized. These studies were conducted by major U.S. engineering firms and involved experienced...

New Techniques and Data Sources for PMP
Testing has been conducted on new methods and storm data sources for the past two years with the purpose of providing more tools to dam owners for the assessment of probable maximum precipitation...

Bishop Intake #2 Spillway Modifications: A Case History
This paper covers the history of the events leading to the modification of Southern California Edison's (SCE) Bishop Intake 2 to pass a site specific design flood. From the...

Natural Disaster Reduction Plan at FERC
At the Federal Energy Regulatory Commission (FERC), natural disasters of concern are caused by three major natural hazards, i.e., floods, earthquake, and droughts. These three hazards...

Brule Hydroelectric Project Inflow Design Flood Study
In 1987, Wisconsin Electric Power Company (WE) was directed by FERC to provide additional spillway capacity at it's 63-foot (19 m) high Brule Dam. Original spillway capacity...

Colorado River Probable Maximum Floods
Upper limit design rainstorms (ULDRS) were developed for three locations in the Colorado River drainage above Hoover Dam. For each location, the rainfall magnitudes, spatial and temporal...

The Unusual History of a Flowline Canal Within a Reservoir
This paper discusses the history of and remedial repairs to a flowline canal which carries water from the headwater of Lake Isabella in California to Southern California Edison Company's...

Ashton Hydroelectric Project Rehabilitation
This paper presents the project experience of rehabilitating the 70-year old Ashton power house and performing the dam design modifications to pass the increased probable maximum flood....

Infiltration of Unconsumed Irrigation Water in Utah
The ground-water hydrology of Panguitch Valley and adjacent areas, south-central Utah, was studied during 1988-90. One objective of the study was to measure ground-water recharge from...

Surface-Drained Level Basins for Rice Production
Surface-drained level-basin systems, consisting of a series of terraced level basins in which a portion of the applied water is drained from the inlet end of the basin, can be used to...

The Effect of Channelization of R?o Puerto Nuevo on Ground-Water Levels in the San Juan Metropolitan Area, Puerto Rico
Channelization and concrete lining of the Rio Puerto Nuevo and its tributaries in the San Juan Metropolitan area has been proposed to control flooding in low lying areas adjacent to the...

A Study of a Flood Control Levee Swamp System
In an attempt to reconstruct the events of the more than 100-year 1987 New Year's Eve storm that occurred on Oahu, Hawaii, an analysis of a complicated overland flow phenomenon...

Numerical Methods for Simulating Debris Blockage Failures and Mudflows
This paper presents the procedures and results from an investigation to evaluate the hydraulic characteristics of mudflow events resulting from hypothetical failures of a debris blockage...

Tidal Flooding Analysis, San Francisco Bay
Many leveed areas adjacent to San Francisco Bay are potentially subject to tidal flooding. In response to this concern, Congress authorized the U.S. Army Corps of Engineers to conduct...

Winds, and Their Effects on Tides, in San Francisco Bay
Many leveed areas adjacent to San Francisco Bay are potentially subject to tidal flooding. In response to this concern, Congress authorized the U.S. Army Corps of Engineers to conduct...

Evaluation of Embankment Erosion at TVA's Chickamauga Project
Studies were made to evaluate the extent of erosion to be expected under probable maximum flood (PMF) conditions. The erosion studies were made using the EMBANK computer program. The results...

Overtopping Flow Spillway for Baldhill Dam, Sheyenne River, North Dakota
An existing gated spillway structure for Baldhill Dam and Reservoir (Lake Ashtabula, North Dakota) is not capable of passing floods up to the probable maximum flood (PMF) without overtopping...

 

 

 

 