Scour Monitoring at Johns Pass and Nassau Sound, Florida
Scour monitoring instruments were installed on two bridges spanning tidal inlets in Florida as part of a research project to develop scour instrumentation. Previous prototype installations...

Bangkok Blockbuster
When completed, the 54-kilometer Bang Na-Bang Pli-Bang Pakong Expressway in Bangkok, Thailand, will be the longest elevated expressway in the world. The precast segmental method is being...

Risky Business
Labor, clients, project conditions and information flow are all potential risks that small design firms face when deciding to agree to a fixed price. If you're in charge of...

Casting Their 'Net
Small engineering firms are exploring new markets, winning clients and bringing in fresh talent�all through their company web pages. Executives from small firms around the country talk...

Monitoring Construction Vibrations (Available in Geoenvironmental Special Issue only)
A review of procedures, criteria and equipment used to protect buildings and other structures from construction generated vibrations, the article begins by describing the importance of...

Betting on the Baseline (Available in Geoenvironmental Special Issue only)
In construction contracts, new deductive differing site conditions (DSC) clauses provide for credits to owners when contractors encounter better-than-anticipated subsurface conditions....

Walled In (Available in Geoenvironmental Special Issue only)
Of the many challenging aspects of the $10.8 billion, 7.5 mi long Central Artery Project in Boston, the construction of soldier pile, tremie concrete (SPTC) walls under the existing elevated...

Through Frozen Ground
The most difficult section of the Massachusetts Bay Transportation Authority's (MBTA) Silver Line transit corridor project is approximately 112 m (400 ft) of tunnel below...

Cold Climate Solution
To reduce turbidity in sedimentation-basin discharge, Anchorage, Alaska, is experimenting with constructed wetlands to augment storm-water discharge treatment from several storm-drain...

Remediation Lessons Learned
Within the past few years a large number of environmental remediation projects have been completed that are now in postclosure monitoring. What lessons can be learned from these projects?...

Small Business Bookmarks
A review of websites geared toward small business owners shows a wide array of resources are available with the click of a mouse. Among our top picks are: Small Business Administration,...

Substructures Stack Up (Available in Structural Engineering Special Issue only)
As part of a 1997 research project sponsored by the Texas Department of Transportation and the Federal Highway Administration, the University of Texas at Austin Center for Transportation...

Into the Fourth Dimension
A team of contractors designed a pharmaceutical plant entirely in 3-D CAD, then linked the renderings to a cost program and scheduling software, adding a fourth dimension�time�to the process....

Site Seeing
Project-specific Web sites (called project extranets) are used to communicate project information in a fast, cost effective and efficient manner. These Web sites act as a project's...

Analysis, Design, Construction, and Testing of Deep Foundations
This proceedings, Analysis, Design, Construction, and Testing of Deep Foundations, consists of papers presented at the OTRC `99 Conference...

Guidelines for the Seismic Evaluation and Upgrade of Water Transmission Facilities
Prepared by the Technical Council on Lifeline Earthquake Engineering of ASCE This TCLEE Monograph provides guidelines for the seismic evaluation and...

Materials and Construction
Exploring the Connection
This proceedings, Materials and Construction: Exploring the Connection, consists of papers presented at the 5th ASCE Materials Engineering...

Metal Building Systems: A New Look
The use of metal building systems in low-rise, non-residential construction under 150,000 square feet has grown from less than 50 percent in 1986 to almost 70 percent today. Such systems...

Resolution Solutions
Disputes over such issues as change orders, extra work, delays, or defective work are an inescapable part of the construction process. By designing an effective dispute management program...

Program Management B.C.
Through a process of forensic analysis that applied modern-day technology to bridge the chasm of time, a team of construction managers with the international architecture/engineering/construction...

 

 

 

 

Return to search