Risk-Based Methodology for Seismic Rehabilitation of Earth Dams
A methodology for seismic risk analysis of earth dams is described. The procedure utilizes seismological and geotechnical inputs together with the associated uncertainties and provides...

Roller Compacted Concrete for Embankment Overtopping Protection
In the first National Dam Safety Inventory and inspection performed by the Corps of Engineers, the majority of deficiencies found were related to the inability of the project to retain...

Construction of CCM Overtopping Protection on Three Parkway Dams
Cellular concrete mat (CCM) systems have been installed as overtopping protection on three small embankment dams along the Blue Ridge Parkway. Based on field tests by others and on the...

Rehabilitation of Cracked Embankment Dams
Cracking is a common phenomenon in many earth embankment dams and especially those small to medium size dams constructed on compressible soil foundations. Collapsible soil conditions,...

Mud Mountain Dam Concrete Cutoff Wall
Mud Mountain Dam is an earth and rockfill flood control dam on the White River. The dam is located approximately 50 km southeast of Seattle, Washington. The dam was constructed in 1941...

Seismic Rehabilitation of Echo Lake Dam
Echo Lake Dam is an existing dam raising a natural lake in the Sierra Nevada in California, along the western edge of the Tahoe Basin. The dam was an embankment built with steep, hand...

Seismic Rehabilitation of Earth Dams
The purpose of this paper is to present methods available for engineered remediation of seismically deficient earth dams (not including tailings dams), review their strengths and weaknesses,...

Liquefaction Potential of Gravelly Soils in Dams
Gravelly soils are common components of embankment dams and their foundations. When such soils have been placed or deposited in a loose condition and are saturated, they are potentially...

Improving Dam Safety Using a Fin Drain
Bloemhoek Dam is an embankment dam with a maximum height of 21 m, which leaked severely after first filling in 1978. This leakage resulted in the development of `boils' over a portion...

Graham Lake Dam Remedial Measures Project
Graham Lake Dam consists of a 550-foot long earth embankment and an 80-foot long concrete spillway. Several concerns were identified during project inspections including limited spillway...

Evaluation of Rehabilitation Needs for Hydraulic-Fill Dam
This paper describes the application of analytical methodologies developed for seismic stability analysis of dams in the western U.S. (particularly the Lower San Fernando Dam in Southern...

Economical Solution for Flood Overtopping Potential at Senator Wash Dam
A breach analysis of North Dike for overtopping with the crest modified to the lower elevation was required to ensure the breach discharge would be adequate to prevent overtopping of Senator...

Rehabilitation of Plane Nine Dam
Plane Nine Dam, an earthen water supply dam near Altoona, Pennsylvania, was constructed in 1907. The dam performed satisfactorily for more than 80 years but it deteriorated with time and...

The Douglas Dam Emergency Response and Rehabilitation
Through the timely response of the Owner, the potential failure of Douglas Dam was averted, and lives and property downstream were protected. The economic losses created by loss of irrigation...

Bureau of Reclamation Experience with Innovative Solutions to Increased Design Floods
Over the last several decades advances in the hydrologist's ability to estimate floods have resulted in increases to the design floods for many existing drainages. As with other dams throughout...

Remedial Works at Troneras and Miraflores Dams in Colombia
The 38 m high Troneras and the 55 m high Miraflores earth dams were built in the period 1959-1965. The dams are composed of residual soils and founded on a deep residual overburden. Significant...

Rehabilitation of a Toe Drain
Old or improperly designed toe drains can cause trouble for embankment dams. Toe drains installed without proper filtering can provide an easy course for internal erosion and piping of...

Geotechnical Modifications at Meeks Cabin Dam
This paper presents a summary of the geologic and geotechnical evaluation of a potential piping deficiency identified at Meeks Cabin Dam as well as description of remedial measures and/or...

General Design and Construction Considerations for Remedial Seepage Control
All earth and rock-fill dams are subject to seepage through the embankment, foundation and abutments. Methods for remedial seepage control include storage restriction, grouting, upstream...

A Review of Drilling and Grouting Methods for Existing Embankment Dams
With the increasing emphasis being placed on dam rehabilitation and repair, more dam engineers are faced with the need to interface with drilling and grouting specialists. Regretfully,...

 

 

 

 