The Great Canadian Bridge Slide
An aging multispan swing bridge had to be replaced in Trenton, Ont., with minimal interference to both river and road traffic, and without changing its alignment. The solution was to build...

More Power to the Allegheny?Design of the Allegheny 8 & 9 Hydroelectric Stations
The 13 MW Allegheny 8 Hydroelectric Station and the 17 MW Allegheny 9 Hydroelectric Station are located on the Allegheny River in the Commonwealth of Pennsylvania. The generating facilities...

Measurements of Time Lag in Concrete Gravity Dam Foundations
Uplift measurements from eight large concrete gravity dams show that the time lag between an increase in headwater level and a corresponding increase in uplift pressure is insignificant....

B.C. Hydro's Practice for Assessing the Foundations of Existing Dams on Rock
Since the early 1980's B.C. Hydro has carried out dam safety reviews which included 33 gravity and embankment dams founded on rock. The foundations include moderately jointed,...

Foundation Investigations of Concrete Dams
This paper discusses a series of foundation investigations conducted on concrete dams by Pacific Gas and Electric Company. The paper focuses on investigative techniques, equipment, appropriate...

Rocky Mountain Project Seepage Cutoff in Solutioned Limestone
The right abutment of the main closure dam for the Rocky Mountain Project required extensive treatment of deeply weathered shale and solutioned limestone to assure control of seepage and...

Stability Analysis of Gravity Dam Foundations with Horizontal Seams
Determination of the overall factor of safety against sliding is an important aspect in concrete dam design. Limit equilibrium methods have serious limitations. A method for determining...

Uplift Pressures and Strengths for Concrete Gravity Dams
This paper presents an overview of the results of a three year study to compile a database of stability parameters and foundation characteristics for older concrete gravity dams. The database...

Analysis and Stabilization of Ambursen Dams?Two Case Studies
Case studies are presented about the analysis and rehabilitation of two slab-and-buttress (Ambursen) dams. The paper discusses the investigation techniques used, including sampling of...

Rocky Mountain Project Conceptual Design of Upper Reservoir
The 9300 acre-foot upper reservoir for the Rocky Mountain Project will be formed by an 80-ft high ring dam with a crest length of 12,800 feet. Sandstone and shale of the Pottsville formation...

Evaluating History?The Edison Sault Powerhouse
The hydroelectric facility owned by the Edison Sault Electric Company at Sault Ste Marie, Michigan was an engineering marvel when it was designed and constructed. This paper explores the...

Evaluation and Rehabilitation of Clogged Drains at Concrete Gravity Dams
Studies have shown that properly spaced drains of adequate depth provide the principal means of relief from uplift pressures beneath concrete gravity dams. Drains often become encrusted...

Prematurely Terminated Slug Tests?A Field Application
Slug tests suffer problems of non-uniqueness to a greater extent than other well tests. Alternatively, a prematurely terminated slug test (PTST) or a systematized drillstem test is proposed,...

Hatchie River and Schoharie Creek Bridge Failures
Within a 2-year period two large bridges collapsed into flooded rivers resulting in a total of 18 people plunging to their deaths. Both bridges had been inspected by probing, but had not...

Scour Measuring and Monitoring Equipment for Bridges
The National Cooperative Highway Research program (NCHRP), through the Transportation Research Board (TRB) of the National Academy of Sciences, is currently sponsoring a research effort...

Preliminary Recommendations from the Task Committee on Standards in Hydraulics
The Task Committee on Standards in Hydraulics has been given the responsibility of recommending whether or not the American Society of Civil Engineers (ASCE) should formulate standards...

Gropps Lake Dam
Gropps Lake Dam has a concrete ogee spillway with earthen abutments at either end of the spillway. The dam features an internal drainage system, outlet works, an energy dissipator, a steel...

Jointless Redecking
If you're redecking a bridge, why not eliminate a major cause of its corrosion at the same time? Why not remove the expansion joints? The Department of Public Works in Steuben...

Special Bedrock Conditions in Greater Boston
The Cambridge Argillite, a weakly metamorphosed shale, forms the major portion of the Boston Basin, a structural as well as topographic depression. In the greater Boston area, the argillite...

Foundation Studies in a Fault Zone and a Steep Valley Slope
This paper presents two case histories which illustrate unique problems in defining the character of rock for support of structures. The first case study concerns a conventional building...

 

 

 

 

Return to search