FHWA'S Bridge Temporary Works Research Program
The Federal Highway Administration (FHWA) has developed a research program to address bridge falsework design and construction. This resulted from the collapse of the Route 198 bridge...

Temporary Structures for Protection and Access
Temporary Structures in Construction Projects (TSC) are utilized for three (3) purposes A. Support (of the structure being built or adjacent structures or utilities) B. Protection (of...

Performance of a Prestressed Rigid Frame During Removal of Column 6W from I93 in Boston, Massachusetts
The first phase of the suppression of Boston's Central Artery included the Early Viaduct Construction in the Central Artery North Area. This project required that Column 6W...

Permanent Structure as Part of the Underpinning System for Boston's Central Artery
The Central Artery, a major six lane structural steel viaduct, has been one of Boston's most significant roadways over the past three decades. Increasing congestion, accidents,...

Design and Planning of Structural Steel Roll-In
Innovative construction methods were required to erect structural steel inside a 170 foot long box truss over a railroad. The contractor engineered and executed a unique system to roll...

Composite Twin Tub Bridge Erection Intersection of Interstate I-84 and I-94 in Hartford, Connecticut
Curved bridge erection requires detailed preparation by the contractor, plus a sharing of responsibility and liability between the owner, designer of the new structure and the contractor....

Wrapping up Environmental Issues in an Embankment
Contamination on a construction site can lead to increased risk of unanticipated construction delays and increased costs. In response, some owners are opting for proactive approaches to...

Implicit Design Knowledge and its Impact on Cost Estimating
Construction cost estimating experiences negative impacts due to a design-construction gap created by the fragmented nature of the AEC industry. Most of the design knowledge and data that...

Construction Inspection in South Carolina
The paper will discuss the experience of the South Carolina Department of Transportation in the use of consulting engineering firms on bridge construction projects. A review of the current...

Central Artery (I-93)/Tunnel (I-90) Project
This paper is intended to provide an overview of the Boston Central Artery/Tunnel Project (CA/T) Project; a $4.9 billion USD interstate highway constructed underground through a densely...

Geotechnical and Construction Aspects of the Immersed Tube Tunnel in Boston Harbor
An immersed tube tunnel (ITT) approximately 3,850 feet in length will be constructed as a part of the Central Artery/Tunnel Interstate Highway Project located in Boston, Massachusetts....

Seismic Design Issues for Immersed Tube Tunnels
This paper provides an overview of the issues and the state of the art techniques in the seismic design of immersed tube tunnels (ITT). Particular focus is given to the ITT presently planned...

Boston Central Artery/Tunnel Project?Fort Point Channel I-90 Tunnel Crossing
Part of the Central Artery and Third Harbor Tunnel Project involves the construction of a very unusual section of immersed tunnel. While the Third Harbor Tunnel which will cross Boston...

Designing Plans for Constructability
The writer has obtained several years experience acting as construction engineer for roadway rehabilitation projects as a consulting engineer. In this capacity, it is necessary to provide...

Constructability?Washington State Highways
During the last decade, efforts were directed towards improving constructability of highway design at Washington State Department of Transportation (WSDOT). This paper briefly summarizes...

Time/Cost Bidding
This paper presents the details of a relatively new and innovative approach to determining the low bidder on highway construction contracts. In the cost and time method each bidder proposes...

Jointless Redecking
If you're redecking a bridge, why not eliminate a major cause of its corrosion at the same time? Why not remove the expansion joints? The Department of Public Works in Steuben...

Rehabbing the U.S.
When it comes to protecting its $1.4 trillion investment in public-works infrastructure, the U.S. has been like a homeowner who puts off fixing a leak until the ceiling lands on his head....

Foundation Studies in a Fault Zone and a Steep Valley Slope
This paper presents two case histories which illustrate unique problems in defining the character of rock for support of structures. The first case study concerns a conventional building...

Double-Decking the Freeways
Elevated highways cost more than at-grade construction. Nonetheless, the hidden costs of increased traffic congestion and the real cost of urban right-of-way make elevated highways feasible....

 

 

 

 

Return to search