Water Policy and Management
Solving the Problems
This proceedings, Water Policy and Management: Solving the Problems, contains papers presented at the 21st Annual Conference of ASCE's...

Partnering for Success
Partnering as a method of doing business is spreading throughout the construction industry. With everyone fed up with the litigious nature of the industry, partnering represents an opportunity...

World Bank Update: In Deep Water
The World Bank has announced a dramatic shift in water policy that will nearly quadruple its spending in this area while it shifts the emphasis toward sustainable development. Instead...

The Key is Constructability
Construction generally involves the collective efforts of owners, designers, contractors and suppliers. During the design phase, the engineer should be mindful of such critical elements...

Constructing Around Contamination
When soil and ground water contamination are found at a construction site, completing the project on time and within budget is always a challenge. Typical problems include constraints...

Computer-Aided Cleanup
In late 1992, the remedial investigation of Operable Unit 2 at the Department of Energy's Fernald Superfund site in Ohio was in trouble. Despite years of effort-including...

A Natural Cleanup
For almost 30 years, nonvolatile petroleum hydrocarbons from used motor oil, diesel, gasoline and other automotive fluids had been released to an oil sum at a truck-maintenance facility...

Jatiluhur Dam: Problems and Rehabilitation
The Jatiluhur Dam in Indonesia, completed in 1965, is an innovative design consisting of rockfill embankment with a clay core and a vertical cylindrical Intake Spillway. Within the Intake...

Twin Lakes Enlargement and Rehabilitation
The Twin Lakes Enlargement and Rehabilitation Project involves an enlarged embankment replacing a two-tiered reservoir system with a single, larger-volume reservoir and new appurtenances....

Rehabilitation of Plane Nine Dam
Plane Nine Dam, an earthen water supply dam near Altoona, Pennsylvania, was constructed in 1907. The dam performed satisfactorily for more than 80 years but it deteriorated with time and...

Seismic Safety Modification of an Old Earthfill Dam
Chollas Dam was built as a water supply reservoir for the City of San Diego. The reservoir is no longer a part of the municipal water system but has been operated since 1966 as a recreational...

Sensitivity Analyses for Total-System Performance Assessment
As a follow-on to Sandia's 1991 preliminary total-system performance assessment of the Yuc1ca Mountain site, this paper presents results of some sensitivity analyses that were done using...

The Most Likely Groundwater Flux Through the Unsaturated Tuff Matrix at USW H-1
Using a probabilistic inverse method, an estimate is made of the groundwater flux through the unsaturated tuff matrix at drill hole USW H-1 in Yucca Mountain. The most likely flux is found...

Radionuclide Migration to the Aquifer Through the Porous Medium
Time dependent doses of radionuclides from a waste container to the aquifer through porous medium are analyzed for (1) congruently released transuranic elements such as Np-237 and (2)...

Groundwater Impacts of Foreseeable Human Activities on a HLW Repository
The Nuclear Regulatory Commission (NRC) staff has begun a program of Systematic Regulatory Analysis (SRA) to help ensure that all important technical issues related to the disposal of...

Groundwater Transport Characteristics of Fracture Zones in a Granite Batholith
Major low-dipping fracture zones are the dominant pathways for the large scale circulation of groundwater through the Lac du Bonnet granite batholith of southeast Manitoba, Canada. The...

Role of Fracture Zones in Controlling Hydraulic Head and Groundwater Flow?Experience from Site Characterization Program in Finland
The preliminary site investigations for the final disposal of HLW produced by TVO have been carried out during 1987 - 1992 in five areas. All the areas consist of Precambrian crystalline...

Discrete Feature Modelling at the Stripa Mine in Sweden: Significance for Hydrologic Modelling of Fractured Rock Masses
The third and final phase of the Stripa Project included a series of characterization efforts, predictions, and validations to determine the viability of discrete-fracture groundwater...

Scenario Development for Performance Assessment?Some Questions for the Near-Field Modelers
In an attempt to achieve completeness and consistency, the performance-assessment analyses developed by the Yucca Mountain Project are tied to scenarios described in event trees. Development...

Hydrogeochemical Site Investigations by Teollisuuden Voima Oy, Finland
Groundwater samples collected from cored boreholes (500-1000 m), borehole wells and multilevel piezometers in crystalline bedrock have been characterized and classified. The reference...

 

 

 

 