Surface-Drained Level Basins for Rice Production
Surface-drained level-basin systems, consisting of a series of terraced level basins in which a portion of the applied water is drained from the inlet end of the basin, can be used to...

The Effect of Channelization of R?o Puerto Nuevo on Ground-Water Levels in the San Juan Metropolitan Area, Puerto Rico
Channelization and concrete lining of the Rio Puerto Nuevo and its tributaries in the San Juan Metropolitan area has been proposed to control flooding in low lying areas adjacent to the...

A Study of a Flood Control Levee Swamp System
In an attempt to reconstruct the events of the more than 100-year 1987 New Year's Eve storm that occurred on Oahu, Hawaii, an analysis of a complicated overland flow phenomenon...

Numerical Methods for Simulating Debris Blockage Failures and Mudflows
This paper presents the procedures and results from an investigation to evaluate the hydraulic characteristics of mudflow events resulting from hypothetical failures of a debris blockage...

Tidal Flooding Analysis, San Francisco Bay
Many leveed areas adjacent to San Francisco Bay are potentially subject to tidal flooding. In response to this concern, Congress authorized the U.S. Army Corps of Engineers to conduct...

Winds, and Their Effects on Tides, in San Francisco Bay
Many leveed areas adjacent to San Francisco Bay are potentially subject to tidal flooding. In response to this concern, Congress authorized the U.S. Army Corps of Engineers to conduct...

Evaluation of Embankment Erosion at TVA's Chickamauga Project
Studies were made to evaluate the extent of erosion to be expected under probable maximum flood (PMF) conditions. The erosion studies were made using the EMBANK computer program. The results...

Overtopping Flow Spillway for Baldhill Dam, Sheyenne River, North Dakota
An existing gated spillway structure for Baldhill Dam and Reservoir (Lake Ashtabula, North Dakota) is not capable of passing floods up to the probable maximum flood (PMF) without overtopping...

Overtopping Protection for A. R. Bowman Dam
Arthur R. Bowman Dam is a 245-foot-high (74.7-m) central-core rockfill dam located on the Crooked River in central Oregon. The probable maximum flood (PMF) would overtop the dam by 20...

Hatchie River and Schoharie Creek Bridge Failures
Within a 2-year period two large bridges collapsed into flooded rivers resulting in a total of 18 people plunging to their deaths. Both bridges had been inspected by probing, but had not...

A National Bridge Scour Data Collection Program
A study to collect and analyze field measurements of bridge scour is being conducted by the U.S. Geological Survey in cooperation with the Federal Highway Administration. The primary objective...

TABS-2 Application to Kawainui Marsh Flood Control
The TABS-2 mathematical modeling system was used to evaluate the effectiveness of alternatives designed to eliminate flooding problems in the Kawainui Marsh located in Kailua on the east...

Application of Appropriate Technology in Hydroelectric Project Rehabilitation
Many older dams are in need of rehabilitation as a result of aging, deterioration, and more stringent safety standards. A primary concern is spillway and stability inadequacies resulting...

Flood Control Design for Development on Alluvial Fans
Hydrology, debris production, sediment transport and hydraulic studies were conducted to provide flood control for a development within an alluvial fan floodplain. Innovative techniques...

Application of a Generalized Risk Dynamic Model to a Spillway Design Flood
Risk analysis can provide a logical basis for selecting the optimal design capacity of a flow conveyance hydraulic structure for the least total cost or specified non-exceeding risk levels....

McClure Park: A Multi-Purpose Off-Stream Storage Facility for Tulsa, Oklahoma
The City of Tulsa is in the process of implementing a flood control plan for the 61 square-mile (158 km2) Mingo Creek watershed. The federally-assisted...

Influence of Wetlands on Streamflow in Illinois
Streamflow records from 30 gaging stations in Illinois were analyzed to assess the influence of wetlands on streamflow. The objective of this research was to determine if streamflow parameters...

Reliability Assessment Method for Flood Forecasts
Peak discharge predictions produced by rainfall-runoff models and used by flood warning and preparedness agencies are subject to uncertainties in the input data, model parameters, and...

Routing for Lake and Tidal Canal Drainage System
A routing method is presented for lake and tidal canal interconnected drainage system in coastal urban areas. Combing reservoir routing, channel routing, and discharge computation of the...

Verification of WASURO Using the Puerto Nuevo Physical Model Study Results
The Jacksonville District, US Army Corps of Engineers, used the hydraulic design computer modeling program, WASURO, for preliminary design of the Rio Puerto Nuevo Flood Control System....

 

 

 

 

Return to search