Bringing Low Flow to Eskimos
Engineers in Alaska initiated a program to bring potable water and wastewater service to a town of 500 Yup'ik Eskimos. This entailed building a 7.2 km boardwalk over permafrost...

Getting Into the Act
The authors present a plan for giving successful presentations and suggest that presenters need to be more aware of presentation style and more scrupulous about chosing, crafting and honing...

The Right Tooele for the Job
Parker describes how the nation's largest chemical munitions destruction facility was designed and how it will operate. The U.S. Signed on to the Chemical Weapons Convention...

Salvaged Sand
Waste foundry sand has been rediscovered as a road construction material now that environmental concerns about its use have been laid to rest. Certain types of waste foundry sand, a by-product...

Rerouting Boston's Utilities
During construction of the Central Artery/Tunnel project in downtown Boston, engineers had to move utility lines over and under both new and existing infrastructure and maintain utility...

Stabilizing the Stacks
Spenser White and Prentis designed a hybrid soil nailing system to ensure that a historic library on the Bryn Mawr, Pennsylvania, campus would not be damaged during adjacent construction...

Factories for the Information Age
As the demand for computer chips continues to soar, designers of microelectronics manufacturing facilities must keep pace with exacting building requirements. Successful projects require...

Wind Endurance
Although property casualty insurance companies are interested in a building's resistance to intense winds, risk underwriters traditionally take into account few, if any, wind-performance...

? for Roofs (Available only in Structural Engineering special issue)
A roof replacement project at a hospital in Huntsville, TX, has to be compatible with the existing structure to meet insurance requirements and withstand the hot summers. The replacement...

Chemical Grouting
Technical Engineering and Design Guide, as adapted from U.S. Army Corps of Engineers, No. 24. This manual provides information and guidance for the...

Evaluation of the Tensar ARESTM Retaining Wall System
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF Service Center. This report evaluates the ARES Retaining Wall System,...

Guide to the Use of the Wind Load Provisions of ASCE 7-95
The objective of the Guide to the Use of the Wind Load Provisions of ASCE 7-95 is to provide guidance in the use of the wind load provisions set forth in ASCE Standard 7-95. The Guide...

Journal of Composites for Construction
The Journal of Composites for Construction publishes original research papers, review papers, and case studies dealing with the use of fiber-reinforced composite materials in construction. Of special interest...

The Murrah Building Design
This chapter reviews the design of the Murrah building....

Building Damage
This chapter discusses the extent of structural damage done to the Murrah building as well as neighboring structures....

Building Collapse Evaluation Guide
This chapter provides a brief guide for the engineer tasked with evaluating a collapsed building....

Architectural Countermeasures
This chapter discusses architectural elements that can be used to prevent, delay, or mitigate the extent of an attack....

Protecting Existing Buildings
This chapter comments on design principles that can be used to better protect existing buildings from the effects of an attack....

Post-Earthquake/Pre-Departure Plans
This section serves as a pre-departure, post-earthquake preparation guide. Tasks are considered for both team members and the team leader....

General Procedures for Conducting an Investigation
This section covers general procedures for conducting an investigation. Topics include lifelines and critical facilities to be investigated; the role of the team leader; getting started;...

 

 

 

 

Return to search