Underwater Tunnel Inspection by Virginia Power Using a Submersible Robot
The Bath County Pumped Storage Station, jointly owned by Virginia Power and Allegheny Power systems and operated by Virginia Power, has three large tunnels linking the upper and lower...

Challenging Site Conditions Lead to Unusual and Innovative Powerhouse Design Features
Pacific Gas & Electric Company's recently completed Newcastle Powerhouse is located on the shore of Folsom Lake near Auburn, California. The $26 million facility uses...

Intake Towers and Outlet Tunnels Adapted for Hydro
An intensive design project was undertaken with the objective of retrofitting two U.S. Army Corps of Engineers (COE) dam sites for hydroelectric power generation. The challenge of designing...

Tunneling through an Existing Concrete Masonry Dam
The Gregory B. Jarvis Hydroelectric Project is located in Upper New York State on the West Canada Creek. Existing facilities include a non-overflow concrete gravity dam, 65 feet long and...

Flashboard Alternatives Including Rubber Dams
This paper reviews some common flashboard methods used in the northeastern part of the U.S., and discusses the advantages and disadvantages of each type. The inflatable rubber dam is presented...

J. C. Boyle Hydroelectric Project Spillway Model Study
The J.C. Boyle Hydroelectric Project is an 80 MW facility near Klamath Falls, Oregon. The project consists of a concrete canal, tunnel, parallel penstocks and two Francis turbines. Upstream...

Flow Characteristics in an Irregular Spillway Model
A physical model of the spillway for a proposed water supply reservoir near Meridian, Texas, was constructed to determine the optimum spillway design which would maintain an acceptable...

Modeling a Small Side Channel Spillway-Model Testing Need Not Be Expensive or Time-Consuming
Effective hydraulic modeling can often be done without sophisticated laboratory equipment and instrumentation, yet provide adequate design information in less time and at less cost than...

Hydraulic Model Studies - Sidney A. Murray Jr., Hydroelectric Plant
The power plant is located at the Old River Control of the Lower Mississippi River (Louisiana). It consists of an intake channel about 5000 ft long, a power plant with eight bulb units...

Physical Model Study of New York State Dam
The New York State Dam is located on the Mohawk River near its confluence with the Hudson River. Downstream from the dam, the river flow is divided into six channels as the water passes...

Moose River Air Chamber Design and Performance
The Moose River Hydroelectric Project is a 12.5 MW development located in upstate New York. It employs an underground air chamber to protect the unit and power tunnel from pressure surges...

Hydraulic Model Tests of Flow around Penstock Suspended inside the Tunnel for Design of a Small Hydro
The proposed hydropower project in the State of Virginia involves design and construction of a steel penstock hung from the crown of an existing outlet tunnel at this U.S. Army Corps of...

Safety Evaluation of PG&E Dams
Pacific Gas and Electric Co. (PG&E) owns and operates 71 hydroelectric power projects in Northern and Central California. With 115 dams in its system, PG&E is the largest...

Mitigation of Ice Effects at Hydroelectric Intake Structures
The design and operation of hydroelectric facilities throughout the northeast United States and Canada must contend with winter conditions for a large part of their yearly operation. During...

Licensing the Moose River Hydroelectric Project
This paper describes environmental considerations in the licensing and permitting of the Moose River Hydroelectric Project, a 12.2 MW development in Central New York State. It illustrates...

Effects of the Environmental Approval Process on Project Scheduling and Economics
The environmental approval process is fundamental to the permitting of hydropower projects. Recent changes in permitting requirements has had a significant effect on the cost and schedule...

New Clues to PMP
Great changes have occurred in meterology in the last two decades. Formerly, weather data were available for forecasting and climatological analyses only at points - at weather stations....

Managing the Columbia River to Meet Anadromous Fish Requirements
According to northwest fishery agencies and Indian tribes the protection for juvenile salmon and steelhead is not adequate. The Northwest Power Planning Council, formed as the result of...

Hydropower and Fish Passage Impacts
The Pacific Northwest Electric Power Planning and Conservation Act (Act) of 1980 formed the Northwest Power Planning Council, which establishes criteria and sets goals for developing future...

Improvement of Dissolved Oxygen Levels at Shepaug Hydro Station
Discharge from Shepaug Dam in Connecticut fall below the state standard for dissolved oxygen in summer and early fall, because of thermal stratification of the upstream eutrophic reservoir....

 

 

 

 

Return to search