Schools and organizations train engineers to use facts. But, engineers are often content to base decisions on their opinions. While engineering judgment is an important part of the professional...

Appendix B: Ten Primary Reasons for Failure in Negotiation
Back matter pages come after the papers or chapters in a published work. This back matter contains ten primary reasons for failure in negotiation....

Physical Model Testing of Broken Armor Stone
Cracking, breaking into two or more pieces, flaking, crumbling, and abrading may reduce an armor stone to a size where wave action can remove it from the structure causing a local instability....

The Optimum Gravity Dam
A method is presented for optimizing the cost of a dam by varying the properties of the material and the shape of the dam to produce the lowest cost water barrier to perform the required...

RCC for Rehabilitation of Dams in the USA-An Overview
The use of roller-compacted concrete (RCC) has rapidly become a powerful new tool in the USA for engineers involved with the rehabilitation of existing dams. Starting in 1980, RCC has...

Design and Proposed Construction Techniques for Pangue Dam
The paper describes the site conditions, design and proposed construction methods for the 115 m high Pangue Dam, Chile's first RCC dam. Trial mix design work and test embankments...

The Construction of New Victoria Dam, Australia
The paper discusses various aspects of the construction of the New Victoria Dam, a 52 m high, high-paste content RCC dam constructed near Perth, Western Australia. The mix design and its...

Design of Miel II?A High RCC Dam
Miel II Dam is a 141 m high RCC structure designed for the tropical mountains of central Columbia. Interesting features are its height (considerably higher than any existing RCC Dam),...

Roller Compacted Concrete Arch/Gravity Dams?South African Experience
The paper traces the development of roller compacted concrete (RCC) dams in South Africa, and in particular the application to arch/gravity dams. The Department of Water Affairs and Forestry...

The Design and Construction of Shuikou Project RCC Diversion Wall
Shuikou Hydroelectric Project, currently under construction on the Minjiang River in the People's Republic of China is a concrete gravity dam having a maximum height of 101...

A Review of Design Criteria for High RCC Dams
The 1980s could be considered to be the decade during which roller-compacted concrete dams came of age. This economic method of construction is sufficiently proven that very large dams...

Performance of Upper Stillwater Dam
Upper Stillwater Dam was constructed with roller compacted concrete (RCC) and horizontally slipformed facing. This unique construction method for a concrete gravity dam included no contraction...

Lessons Learned from Elk Creek Dam
This is the third of a series of papers published on the design and construction of Elk Creek Dam. The first paper discussed design and construction concepts to provide water tightness...

Roller Compacted Concrete Tailing Retention Dam
A roller compacted concrete (RCC) dam has been designed for gold tailing impoundment in southeast Alaska. To minimize up front capital costs, the curved gravity dam with multiple outlet...

Concepcion Dam Design & Construction Problems and Their Solutions
Concepcion Dam is a curved axis gravity structure 68 m high and 695 m long. It supplies water to Tegucigalpa, the capital of Honduras. The dam contains 290,000 cubic meters of RCC. Challenges...

RCC Dam Construction?A Contractor's View
A contractor's view of RCC dam construction is presented. It begins with the principal construction elements and the challenge created by their interrelationships. Men and...

Economic Factors in Roller Compacted Concrete Dam Construction
This paper deals with some of the economic factors that designers and contractors need to consider in the design and execution of an RCC dam. Costs for the RCC portion of the Upper Stillwater...

Mixing and Delivery of Roller Compacted Concrete
Mixing and delivery of RCC are discussed. Both the design aspects such as variability and joint quality, and the construction aspects such as equipment capability and performance are covered....

Construction of Urugua-I RCC Dam
Considerations concerning the RCC construction process and its relation with the design and quality are analyzed. The paper contains topics related to the experience obtained at Urugua-i...

Behavior of Urugua-I Dam
URUGUA-I with its 76 m height is one of the higher lean roller compacted concrete dams. The project includes some outstanding features like the very low cement content and a PVC membrane...

 

 

 

 