Filling The Bay: Deepening the Oakland Inner and Outer Harbors
The project to deepen the Oakland Inner and Outer Harbors from elevation -42 to -50 ft was federally authorized in 1999 to accommodate the next generation of post-Panamax container ships....

Innovative Use of a Groin Structure: Saving Cost, Shortening the Schedule, and Minimizing Impacts
Almost any type of construction activity can pose a shock to the surrounding environment and habitat. Obviously, the extent of the impact will depend on the location of the project and...

The New Bedford Marine Commerce Terminal
When construction of the first American offshore wind farm support terminal encountered greater challenges than expected, jet grouting enabled construction to continue....

Geo-Congress 2014
Technical Papers and Keynote Lectures
Proceedings of the 2014 Geo-Congress, held in Atlanta, Georgia, February 23-26, 2014. Sponsored by the Geo-Institute of ASCE. GSP 234, Geo-Congress...

Failure of a Large Circular Excavation
A circular excavation, 117 feet (36 m) in diameter by 90 feet (27 m) deep, was designed by an experienced engineering firm and construction was performed by an experienced contractor....

Failure of a Twenty-Foot High Retaining Wall
A cantilever retaining wall, designed in apparent accord with provisions in a civil engineering handbook, failed soon after construction. Analyses of the causes of the failure are presented....

Advanced Fracture Control Procedures for Deepwater Platforms and Compliant Towers
This paper describes an integrated approach to fracture control problems � applied first as a necessary adjunct to the authors' own engineering practice, then in developing...

Sustainable Development � A Geotechnical Perspective
Sustainability has become a key factor in major construction projects these days, and many geotechnical engineers have started focusing on the concept. Owners, public agencies, and the...

Asset Management of Earth Retaining Structures: Design through Design Life
Regarding new earth retaining structures (ERS) construction, the message is clear: plan for asset management. New construction is certainly not immune to performance issues, and the time...

So, Why Do You Want to Write a GBR?
Since 1974, scores of papers, articles, conferences, and legal documents have been dedicated to explaining how to write and/or how to use a Geotechnical Baseline Report (GBR). But the...

Geo-Hubei 2014 244-255
Sustainable Civil Infrastructure, Innovative Technologies and Materials
Selected papers from the proceedings of the Geo-Hubei 2014 International Conference on Sustainable Civil Infrastructure, held in Yichang, Hubei, China, July 20-22, 2014. Sponsored by the...

Challenges and Risks of Jet Grouting in a Congested Urban Environment
In the heart of London, one of Europe's largest jet grouting contracts is nearing completion. The jet grouting is part of the overall 7-year-long upgrade project to London...

Support of Excavation Challenges and Solutions at a Manhattan Excavation Site
This article discusses the challenges and alternate solutions encountered in 2012 during support of excavation operations at a medical center project site in Manhattan, NY. The project...

The Future of Underground Construction Monitoring
In the past 15 years, the tools and techniques used to monitor the performance of existing ground and surrounding structures during construction have improved significantly. Practice is...

Data Management System and Construction Monitoring Results from Wolf Creek Dam Rehabilitation
A review of the rehabilitation of Wolf Creek Dam and the Wolf Creek Information Management System (WCIMS), a Geographic Information Systems (GIS)-based application that was developed to...

Geotechnical IT Revolution: Intelligent Compaction and Beyond
The explosion of innovative developments in the IT industry is making many of us geotechnical engineers green with envy. We want some new technology, too! Luckily, advances in sensors...

Improving Construction Quality by Seeing What's Hidden Underground
One of the challenges of deep foundation projects is the inability to see what's being built at depth. Construction is hidden below ground, in soil or rock conditions that...

Karst-Related Sinkholes: Dynamic Compaction as an Effective Remediation Option
The paramount issue to address before constructing at sites underlain by karst topography is identification and remediation of sinkholes which exist close to the surface, and specifically...

2011 OCEA Finalists Videos
Introductions for ASCE's 2011 Outstanding Civil Engineering Achievementaward finalistsalong with the acceptance speechof the winner, the Louisville Water Company. Also shown...

Offshore Technology in Civil Engineering
Hall of Fame Papers From the Early Years
Prepared by the Program Committee of the Offshore Technology Conference of the Coasts, Oceans, Ports, and Rivers Institute of ASCE. This series presents...

 

 

 

 