Harrisburg Hydroelectric Project?Water Quality Issues
The Harrisburg Hydroelectric Project is a proposed 34.4 MW hydroelectric facility on the Susquehanna River near Harrisburg, Pennsylvania. The project will consist of a 16.5 ft high gated...
EPRI's Pumped Storage Planning and Evaluation Guide
EPRI's Pumped Storage Planning and Evaluation Guide was published in 1990. The Guide provides step-by-step procedures to: (a) evaluate pumped-storage operation in a utility...
Benefits and Applications of Modular Hydroelectric Pumped Storage
Hydroelectric pumped storage is the only proven and most efficient technology available for energy storage. It is used by utilities to provide peak and intermediate power and to optimize...
Feasibility of Adding Small Hydro to Federal Hydraulic Structures in the Upper Ohio River Basin
A national hydropower program exists in which non-Federal interests may develop power at Federal hydraulic structures which have that potential. This paper discusses associated considerations...
Hydraulic Model Studies for Non-Federal Projects at Federal Dams?A Case Study
This paper will discuss the hydraulic model studies for hydropower projects developed by Arkansas Electric Cooperative Corporation (a non-federal entity) at existing Corps of Engineers...
Overcoming the Obstacles?Hydroelectric Development on the Kankakee River
A number of difficulties were encountered and resolved during development of a 1,200 kW hydroelectric project in northeastern Illinois. Located at the site of an abandoned hydroelectric...
Lake Siskiyou Power Project
The Lake Siskiyou Power Project was constructed at the foot of the existing Box Canyon Dam on the Sacramento River in Northern California. Major project features included the construction...
Undeveloped Hydropower Resource Potential
The public hearings conducted as part of the National Energy Strategy produced testimony that concluded that the potential for development of hydropower was not well defined. As a result,...
Net and Hydroacoustic Monitoring of Fish Passage
In 1986 EPRI published a review of available fish protection technologies for use at hydroelectric facilities. One major conclusion of that study was that fish protection systems were...
Load/Resource Matching for Period-of-Record Computer Simulation
The Southwestern Power Administration (Southwestern), an agency of the Department of Energy, is responsible for marketing the power and energy produced at Federal hydroelectric power projects...
Computer Modeling of Reservoir Sedimentation and Sluicing
A recently developed computer program which simulates the evolution, growth, and movement of a submerged delta in reservoirs was tested for Spencer Dam and Reservoir in Nebraska. The code,...
Decision Rules for Reservoir Releases
One of the problems faced with computer modeling of a multi-reservoir, hydro-power system is making decisions on how releases will be made. Reservoirs many times have multiple demands...
The Wisconsin River System Operations Model: WIRSOM
The passage of the Electric Consumers Protection Act of 1986 requires the Federal Energy Regulatory Commission to give equal consideration to non-power as well as power values in hydroelectric...
A Flow Forecasting System for Hydro Power
The flow forecasting system comprises a network of meteorological stations, a weather forecasting model, and a watershed hydrologic model, implemented in a microcomputer. The meteorological...
Calculation of Three-Dimensional Turbulent Flow in Francis Turbine Runner
A numerical scheme, based on MacCormack's predictor-corrector explicit finite volume method, for solving three-dimensional weakly compressible inviscid, laminar, and turbulent...
Development of a New Hydraulic Design Tool for Spiral Casing/Distributor Geometry
A novel computational model has been developed to predict highly complex turbulent flow in a combined spiral casing/distributor geometry. Validation of the computational model against...
Design of Powerhouse Spiral Case Considering Three-Dimensional Action
A commonly used approach of designing semi-spiral cases for Kaplan turbine installation using two-dimensional frames becomes unsuitable for large diameter turbines and/or high heads. The...
Optimal Real-Time Control of Hydroelectric Power Plant Using Dynamic Programming
In this paper, an approach of optimal real-time control of hydroelectric power plant operations is presented. The methodology is based on a dynamic programming technique where the original...
Voltage Regulator Influence on Generator System Stability
During initial startup of a generator system, it is not uncommon to witness generator voltage instability. Most of the time, the solution is reduced to returning the stability control...
Measurements of Time Lag in Concrete Gravity Dam Foundations
Uplift measurements from eight large concrete gravity dams show that the time lag between an increase in headwater level and a corresponding increase in uplift pressure is insignificant....
Return to search