Drainage Problems in a Highly-Developed Shoreline Area
Hilton Head Island, South Carolina, is a 42-square mile barrier island on the south-east coast Flooding of roads and properties is a continual problem in this low-lying, flat area due...
Santa Ana River Project Overview
The Santa Ana River Project, authorized for construction by the Water Resources Development Act of 1986, is designed to provide urban flow protection to the growing communities in Orange,...
Seven Oaks Dam Outlet Works Design
The U.S. Army Corps of Engineers has completed the preliminary design of the outlet works for the proposed Seven Oaks Dam. The dam is the upstream-most feature of the Corps'...
Sediment Ramping at Mill Creek
A Corps of Engineers study completed in 1988 analyzed this ramping phenomenon Mill Creek in Southern California Using an approach which combined sedimentation research with Corps experience...
Lower Santa Ana River Hydraulic Design for Levee Overtopping
The purpose of overtopping or freeboard design is to minimize damages and catastrophic failure from floodwaters overtopping levees. This case study is presented to show the approach taken...
Geographic Information System/Watershed Model Interface
Geographic information systems allow for the interactive analysis of spatial data related to water-resources investigations. A conceptual design for an interface between a geographic information...
Interfacing Geographic Information System Data with Real-Time Hydrologic Forecasting Models
This paper discusses a plan to incorporate remotely sensed spatial data into a real time hydrologic decision support system. Because of the nature of the hydrologic forecasting system,...
Physical Modeling of Heated Discharges into a Stagnant River
An alternative cooling system study was performed for the Damietta Combined Cycle Plant in Egypt. The alternatives included spray canals, helper cooling tower and once-through cooling....
Hydraulic Analysis of the Schoharie Creek Bridge
Ten people died on April 5, 1987 as a result of the collapse of two spans of a New York State Thruway bridge into the floodwaters of Schoharie Creek. The cause of the bridge failure was...
The Illinois GIS and Hydrologic Database
Development of the Illinois Geographic Information System (GIS) from 1983 to the present is described including the hardware configuration and ARC/INFO software. The database design at...
Application of Geographic Information Systems for Flood Risk Mapping
This paper presents an overview of the Federal Emergency Management Agency's (FEMA) efforts to automate flood risk mapping performed in support of the National Flood Insurance Program...
GIS Applications to the Water Resources Development Program of the U.S. Army Corps of Engineers
The ability that a Geographic Information System (GIS) offers to quickly reference multiple data sets to an overall base map and to one another provides the potential opportunity to greatly...
Development of a GIS for the U.S. Great Lakes Shoreline
The Computer Mapping Center of the Detroit District, U.S. Army Corps of Engineers (USACE) is developing a Geographic Information System (GIS) to contain physiographic, demographic, and...
Southwest Pass Training Structure Alternatives
The U.S. Army Engineer Waterways Experiment Station system of computer programs, TABS-2, was utilized to evaluate various structural plans for increasing channel velocities and sediment...
Grid Requirements for Numerical Models Containing Training Works
The numerical modeling of the rapid changes in flow variable in open channel flow systems containing training works, such as dikes, requires special attention in grid development. This...
Design Procedures for Soil-Cement Grade-Control Structures
Grade-control structures are effective channel-stabilization measures that may be used singly or as a part of a stabilization plan involving such measures as bed and bank revetment. Grade-control...
Design and Performance of Diversion Gates at Peace Canyon Dam
During construction of Peace Canyon Dam, river diversion was accomplished using a combination of cofferdams and temporary diversion conduits through the partially completed dam. Inlet...
Utilization of Expert Systems for the Operation of Reservoir Systems
This paper illustrates how knowledge-based expert systems can obtain, organize, document, store, and utilize valuable complex reservoir systems experience, obtained by experienced water...
Risk Assessment of System of Dams
The application of risk assessment to a series of dams on a river is presented here. A general discussion of the basic principles of risk assessment approach to dam engineering is given...
Channel Changes in the Platte River, 1926?1986
The Platte has changed significantly during the last century. A meandering channel with extensive riparian vegetation growth has replaced, the once braided and unvegetated channel in some...