The Tunnel That Transformed Philadelphia
The 1985 Outstanding Civil Engineering Achievement is the Center City Commuter Rail Connection, a 1.7 mile tunnel connecting two former stub-end railroad stations in Philadelphia. The...

Record Bridge Replacement
Jacks Run Bridge had to be rebuilt in one year instead of the usual two to three. So the Pennsylvania Department of Transportation spearheaded the quickest replacement of a major bridge...

Engineering Education: An Update
ASCE held an engineering education conference in April, 1985, entitled, Educators and Practitioners�Where Are We Going? Participants agreed that a greater interchange is beneficial between...

Construction-Induced Dynamic Pressure and Corresponding Impact Factors for Pipelines
The Bureau of Reclamation, U. S. Department of the Interior, conducted a study which measured pressure exerted by construction scrapers on a rigid, buried, instrumented concrete slab....

Effect of Shallow Trench Construction on Cast Iron Pipelines
This paper summarizes the results of three-dimensional finite element analyses to evaluate the strains and displacements sustained by 4, 6, and 8-in. (100, 150, and 200 mm)-diameter cast...

Metal and Plastic Pipelines: Design and Construction Aspects
This paper discusses design and construction aspects of four cross-country pipelines that were built in central Alberta, Canada during 1982-1983. The first two pipelines, carrying different...

Successful Use of Trench Box in Sewer Line Construction
Faced with the problems of ever increasing construction costs, more and more methods are being employed in an attempt to keep expenses to a minimum without sacrificing the quality of construction...

Sewer Construction Inspection and Testing
Sewer construction testing is the final portion of the team effort that started with the goal of meeting the requirement for a sewer system for the protection of health and environment....

Unique Installation Methods for Large Interceptor in Poor Soil Conditions
The construction of approximately 1. 5 miles of a major sewer interceptor in downtown Boston encountered some unique construction challenges. The entire route required dewatering during...

SPIDA: An Analysis and Design System for Buried Concrete Pipe
The paper presents a description of a new computerized direct design method for buried concrete pipe named SPIDA (Soil-Pipe Interaction Design and Analysis). Also the technical basis and...

Experiences in Concrete Pipeline Construction in Ontario 158-1985
The paper discusses the title subject in terms of concrete pipe fabrication methods and plants, pipe jointing and jointing materials, and construction experiences in the Province of Ontario,...

Simplified Stress and Deformation Analysis for Pipeline Construction
This paper discusses the strength and deformation behavior of flexible steel pipes during pipeline construction. Some possible simple and quick solutions to these special design and construction...

Earth Pressure and Surface Load Effects on Buried Pipelines
Rational techniques for analyzing earth pressure and surface load effects, based on finite element analysis methods, have been developed and applied extensively to the design of buried...

Characterization of Soil Arching Above Buried Conduits
Conventional ways of assessing the effects of soil arching over buried conduits were examined by means of finite element analyses. It was found that neither of the conventional soil arching...

Response of Buried Flexible Plastic Conduits Under Loading
Structural performance of 75 mm and 100 mm diameter plastic conduits embedded in Lloyd clay were examined experimentally in a laboratory soil bin, and numerically by the finite element...

A 1-D Saltwater Intrusion Program on the IBM-PC
A one-dimensional finite element program has been developed for use on the IBM-PC as an aid to teaching groundwater hydrology to students. The program uses linear elements and the Galerkin...

Stormwater Routing for Small Sites
Traditional hydrologic analyses and detention design procedures are too time consuming and costly to be warranted for small projects. This paper discusses a direct solution for sizing...

Flowfield Analysis with a Workstation
An engineering analysis workstation has been developed to expedite flow analysis. The workstation couples a microcomputer, a powerful numerical equation solver, and a versatile graphics...

Computer Model Study of a Contaminated Well Field-Groundwater Pollution Source Identification and Contaminant Plume Simulation
Toxic waste contamination is currently threatening the public water-supply wells of the Town of Vestal, New York. As a practical tool to assist the remedial investigation, a two-dimensional...

Modeling Hydraulic Problems Using the CVBEM and the Microcomputer
The Complex Variable Boundary Element Method (CVBEM) offers an effective and efficient means for modeling two-dimensional potential and related flow problems. The method has been applied...

 

 

 

 

Return to search