CTA's Experience in Fostering Station Redevelopment Through Public/Private Partnerships
The paper reviews the experience of the Chicago Transit Authority's partnerships with the private sector. The funding, space, design, construction and operation components...

The Magnetically Levitated Transport System TRANSRAPID?Characteristics and Aspects of Application
After a development of less than two decades the magnetic levitation TRANSRAPID is virtually ready for revenue service since 1985. The service has been continuously tested since 1985 on...

Financing Transit: Benefit Assessment in Los Angeles
The Southern California Rapid Transit District (SCRTD) has successfully used benefit assessment to fund a portion of the Los Angeles subway project and to provide the critical private...

Establishing the E-470 Project Definition
Establishing the project definition for a large bond-financed highway is significantly different from that for a traditional highway trust fund project. The costs of such a project and...

The Extension of the Docklands Light Railway
The Docklands Light Railway is a publicly funded automated light rapid transit system that was opened in 1987, linking the fringe of the financial district of the City of London to an...

Public/Private Partnership for Development of the South Brunswick Station
Because of projections for continued residential and commercial growth and a large gap between stations, NJ TRANSIT decided to construct a new station in the Township of South Brunswick....

Public Private Joint Development Partnership San Diego MTS/James R. Mills Building Project Success Through Self-Fulfilling Prophecy
The MTS/James R. Mills Building Project provides a regional transportation center for downtown San Diego, where San Diego's three light rail transit (trolley) lines and several...

Creating the Proper Environment: The Consultant's Role in the Privatization of Public Transportation Projects
The consultant can provide input for the development of political consensus for individual projects by providing technical support, accurate costs, realistic schedules, and experience...

The Chicago-Kansas City Tollway: Lessons for Future Projects and Policy
The paper discusses an innovative mixed public-private financing plan and implementation plan for an investor-owned toll road connecting Chicago and Kansas City. The two plans utilize...

Public/Private Participation in Transportation in Jacksonville, Florida
A discussion of the status of public/private participation in development and transportation projects in Jacksonville, Florida. The special efforts to encourage downtown redevelopment,...

Translating Bridge Tolls to a New Bridge: The Third Dartford River Crossing
In March 1986, the Department of Transport of the United Kingdom Government published Guidelines inviting promoters for the submission of private sector bids for the design, construction...

Glacial Icemelt in the Wind River Range, Wyoming
The Wind River Range of Wyoming contains the greatest concentration of glaciers in the American Rocky Mountains with two of the larger glaciers being Dinwoody and Gannett Glaciers. This...

Assessing Nonpoint Pollution Potential of Surface Waters Using a Geographic Information System
The use of Geographic Information Systems (GIS) to determine the susceptibility of surface waters to nonpoint pollution is described. The Geographic Resources Analysis Support System (GRASS)...

Utility of a GIS in Watershed Management?A Case Study
A geographic information system data base was established for a small watershed in Shelby County, Tennessee, for both surface and subsurface water attributes. The surface water portion...

An Integrated GIS and Model for Assisting the Managers of an Army Training Area
The ARC/INFO geographic information system (GIS) has been combined with the ARX spatial expert system and the SMSP soil moisture-soil strength model to assist the managers of a major training...

Effects of Water Erosion Processes on Drainage and Irrigation Systems
This study examines the relationship between geomorphic processes and drainage/irrigation projects. It illustrates the method of geomorphic analysis by the study of a drainage project...

Sprinkler System Design for Frost Protection
Both undertree and overtree systems for frost protection by sprinkling are currently being used. The criteria based on experimental results and theoretical modeling have been reviewed...

Rehabilitation and Modernization of Irrigation Projects is Often a Cover-up for Poor Quality Construction and Maintenance
Decreasing land and water resources available for irrigation projects is placing greater empasis on rehabilitation and modernization of irrigation projects. Inferior quality of the initial...

Understanding Delivery Performance Before Rehabilitation
In the initial stages of project formulation, decisions are made regarding the method for allocating water, and the method for physically distributing water. Any major rehabilitation effort...

Upgrading of the Orange Cove Irrigation District Water Distribution System
The Orange Cove Irrigation District covers about 28,000 Acres in the Central Valley of California. It is supplied from the Friant-Kern Canal. A semi-closed low pressure pipeline system...

 

 

 

 

Return to search