Stochastic Beams on Elastic Foundation
The finite difference method is applied to the second-moment analysis of beams on elastic foundation with random characteristics. The method is simpler than the stochastic finite element...

Probability-Based Load Criteria for Structural Design
Load criteria for use in limit states design of structures are developed using probabilistic methods. Statistical data on load and strengths are integrated by the reliability analysis...

Design Load Combination Factors
This paper reviews alternative load combination formats for ultimate limit states in codified structural design. The need for explicit consideration of load-time variations and random...

Transit Operations Input to Project Planning and Design
The rationale for most public transportation projects is a requirement imposed on the operating agency by an existing or expected service demand. These expected operations may be intended...

Aesthetics and Design of Prestressed High-Rise Buildings
This paper will address the aesthetics, economic and construction-related advantages of prestressed concrete for high-rise buildings, with an emphasis on the South-East Asia region. While...

Bentonitic Slurry in Constructing Drilled Piers
Bentonitic slurry is employed extensively in the construction of drilled shafts. While serious problems can occur, evidence is presented to show that the proper use of slurry will lead...

Installation of Category I Caissons
Founding a proposed safety-related Category I structure of a nuclear power plant on rock socketed caissons necessitated using precision installation techniques. These techniques were chosen...

Observations on Load Tests for Drilled Shafts
This paper focuses on three specific areas pertaining to load tests for drilled shafts: 1) basic considerations and load testing procedures, 2) interpretation of uplift load test information,...

Quality Assurance/Quality Control; Case Studies?Introduction
The report emphasizes several requirements for quality management: a. The need for a knowledgeable field representative, preferably the resident engineer. This person must be familiar...

Quality in the Constructed Project: A Workshop Report
In the fall of 1984, ASCE conducted a workshop to determine what actions are necessary to improve quality in the constructed project. The engineering segment of the two-day meeting included...

Quality Management in the US Army Corps of Engineers: An Evaluation
Quality management programs are employed to assure the achievement of specific standards of performance. In the construction industry, quality management personnel face common problems...

The Role of the Quality Assurance Management on a Large Commercial Project
The role of the quality assurance manager on a high rise project being built on a tight time schedule is a challenging and diversified assignment. It is made especially difficult when...

Construction Management: Dallas North Tollway Project
This article will attempt to illustrate the importance of flexibility of the design and construction inspection process to insure the project is constructed within the time and budget...

Managing Quality into the Workplace
In February, 1983, the author's organization began a process designed to enhance attitudes about quality in every individual member of the organization. The process requires...

South Branch Rockaway Storm Water Management Study
The Division of Water Resources of the New Jersey Department of Environmental Protection, the Hunterdon Soil Conservation District, the United States Department of Agriculture's...

An Ecosystem Approach to Watershed Management
An example is drawn from the Little River Research Watersheds near Tifton, Georgia. Riparian hardwood forests (low management) and upland agricultural fields (high management) are the...

Assessing Risks of Impaired Hydrologic Function
This paper describes the rationale and use of a 'resource tolerance' to evaluate hydrologic function and presents a method to establish a relative tolerance threshold...

Erosion, Productivity and Rangeland Watershed Planning
The Bureau of Land Management is responsible for the management of over 160 million acres of rangeland in the western United States. The principal uses of these rangelands are the grazing...

Snow Management at Ski Areas: Hydrologic Effects
Several types of snow management are practiced at downhill ski areas. Each of these activities has a variety of hydrologic consequences. The extent to which these management practices...

Closed Negotiations?Out with the Poker Players
The paper describes the closed negotiation process employed by one owner/client, the U. S. Army Corps of Engineers, in procuring firm, fixed price design service contracts. Although not...

 

 

 

 