Recent Results on the Effect of Gamma Radiation on the Durability and Microstructure of DWPF Glass
The effect of gamma radiation on the durability and microstructure of a simulated nuclear waste glass from the Savannah River Site has been carefully investigated. Three large pieces of...

Computed Distributions of Residual Shaft Drilling and Drift Construction Water in the Exploratory Facilities at Yucca Mountain, Nevada
The Yucca Mountain Project is studying the feasibility of constructing a high-level nuclear waste repository at Yucca Mountain in southwest Nevada. One activity of site characterization...

Multi-Dimensional Modeling of Unsaturated Flow in the Vicinity of Exploratory Shafts and Fault Zones at Yucca Mountain, Nevada
Modeling studies were conducted to determine the potential effects of exploratory shafts on moisture distribution in the vicinity of an exploratory shaft facility, and the potential for...

Influence of High Burn Up Nuclear Fuel and MOX on the High Level Reprocessing Waste Management
This paper compares characteristics of high level waste issued from the reprocessing of high burn up fuel (HTC) and mixed oxide (U-Pu)O2 fuel (MOX)...

Development of a CRUD Particle Size Distribution and Its Effect on Cask Source Term and Containment Analyses
Spent pressurized-water reactor (PWR) and boiling-water reactor (BWR) fuel rods from three reactors were examined by hot cell periscope, energy dispersive x-ray analysis, and scanning...

The Expected Condition of Spent LWR Fuel on Delivery to a Repository
The condition of spent fuel on delivery to a repository is affected by its service in the reactor and by the postirradiation activities including wet and dry storage; fuel examination,...

Global Problems: Implementing Mission to Planet Earth
Serious global environmental problems are facing our generation on Earth. The decrease in ozone concentrations and the greenhouse effect have implications for all life forms on the planet....

Fluid Behavior Considerations for Waste Management in Low-Gravity Environments
Design of waste recycling systems for spacecraft requires a knowledge of fluid behavior in microgravity. As gravity is reduced, phenomena usually ignored in the One-G environment of earth...

Challenges and Opportunities in the '90s and Beyond?A U.S. Army Corps of Engineer's Perspective
In the foreseeable future, water resources expenditures will probably be dominated by environmental/water quality concerns. Strong focus is coming to bear on the state of repair, rehabilitation...

Water Resources Infrastructure Review
This paper reviews the three reports forming the basis for the U.S. National Council on Public Works Improvement water resources infrastructure related findings. It also reviews the soon...

Removal of Scale from Potable Hot Water Systems by Carbon Dioxide Injections
An innovative method for inplace scale removal has been developed and demonstrated. Injection of carbon dioxide gas into a piping system can lower the pH of the hot water and remove or...

Renovating the Riverside Water Plant?A Case Study
In 1986, the City of Waco, Texas began construction of the first of four projects designed to renovate the Riverside Water Treatment Plant. The water treatment plant was originally constructed...

The Use of Submersible ROVs for the Inspection and Repair of Water Conveyance Tunnels
At Virginia Power's Bath County Pumped Storage Station, robotic technology was pioneered through the development of a purpose-built Remotely Operated Vehicle (ROV) to gain...

A Design Process for Water Distribution Systems Including Optimization
Design of a water distribution system is a multi-level process from preliminary planning to final detailed sizing of components. Unfortunately as in many design problems, a final detailed...

Upgrading Hydraulic Infrastructure for Level One Redundancy
In the current paper a methodology is presented for upgrading any single source water distribution system in order to provide a level one system redundancy at a minimum cost. A level one...

Optimal Control Strategies for Water Distribution Systems
The overall operation problem becomes one of determining which pumps to run and when to run them so that electrical unit costs and electrical demand charges are minimized while at the...

A Methodology for Optimal Control of Pump Stations
Pumping water to utility customers is an expensive service which consumes large amounts of energy. Most approaches to date require simplifications and assumptions for the specific system...

Creatively Cost Sharing a Large Flood Control Dam
The passage of Public Law 99-662 in November of 1986, commonly known as the Water Resources Development Act of 1986, added a new dimension to Federal development of water resource projects....

Predicting Watermain Breakage Rates
Recent studies on water main breakage have shown significant spatial and temporal clustering in the breakage pattern. The methodology described in the paper provides the basis for a prediction...

Infrastructure Investment During a Boom/Bust Cycle
During a boom period, a utility can find itself in a position where the usual rules of thumb for making investment decisions are no longer trusted. If the utility enters the boom period...

 

 

 

 

Return to search