Computer-Aided Negotiation of Water Resources Issues in California's Central Valley Project
The U.S. Bureau of Reclamation operates the Central Valley Project (CVP) in California. The CVP is a large system of streams, reservoirs and canals in California's Sacramento and San Joaquin...

Computerized Resource Planning for the Central Valley Project, California
The Central Valley Project (CVP) consists of nine reservoirs and ten powerplants owned and operated by the United States Government. On an average water year basis, the CVP, with a maximum...

Computer Simulation of CVP Power Production for Integration With PG&E's Power System
The Central Valley Project (CVP) has an installed hydropower capacity of over 1800 MW. The project facilities and its preference power customers lie dispersed within the service territory...

California's Adaptable Model for Operations Planning for the State Water Project
Operations of the California Aqueduct, a 440-mile-long feature of the State Water Project (SWP) consisting of canals, pipelines, reservoirs and hydroelectric plants, are planned using...

Development and Application of Hydrologic Forecast Systems
Hydrologic forecast systems generally consist of several components which include computer hardware and software to perform data handling functions and enable users to calibrate hydrologic...

What is Necessary to Forecast River Flows Reliably?
The problem of forecasting river flows employing conceptual rainfall-runoff models is reviewed stressing the important connections that exist among data requirements, model structure,...

Channel Routing for Improved Flood Control
Lake Wappapello, located on the St. Francis River in southeastern Missouri, is operated by the St. Louis District (SLD) Corps of Engineers for purposes of flood control and recreation....

Development, Calibration and Application of Runoff Forecasting Models for the Allegheny River Basin
The computer program HEC1F, developed by the Corps of Engineers' Hydrologic Engineering Center, performs runoff forecasting. The focus of this paper is on application of HEC1F...

Streamflow Forecasting for Hydropower Operations Using Interactive Modeling Systems
This paper discusses the development of the Snake River Forecast Model (SRFM), a streamflow forecasting system for long-range planning and short-range operation of fifteen hydropower projects....

Operational Forecasting in Complex River Basins with SSARR-Micro Versus Mainframe Computer
The Streamflow Synthesis and Reservoir Regulation, (SSARR), model has been used for many years for river forecasting and reservoir system modeling in the Columbia River Basin. Operational...

Multi-Purpose, Multi-Reservoir Simulation on a PC
The methodology and difficulties in converting a large, general purpose, mainframe, batch oriented computer program (for reservoir simulation) to work effectively in the PC environment...

Colorado River Microcomputer Model
This paper describes a computer model which simulates the monthly water and power operations of the twelve reservoirs in the Colorado River Basin for a given demand projection in the future....

An Emerging Application of Microcomputers in Water Control
Plans being developed at the Corps' Hydrologic Engineering Center propose a gradual transfer of water control support from minicomputers to a network of microcomputer workstations....

Development of the Hydrodata CD-ROM Data Storage System
To store and retrieve data from two of the USGS WATSTORE databases - the daily and peak values files - and the Summary of the Day file from the National Climatic Data Center, the authors...

Optimal Operation of Complex Multireservoir Systems
The paper provides brief descriptions of papers presented in two workshop sections, and of discussions on modeling reservoir systems. The sections are on optimal operation of complex multireservoir...

Application of DDDP for Optimal Daily Operation of the Niagara Generating System
This paper describes the application of Discrete Differential Dynamic Programming (DDDP) to determine the optimal operation of Ontario Hydro's Niagara Generating System, on...

Short-Term Hydroelectric Scheduling Model for WAPA
An optimization model, data system, and a series of user-friendly input/output screens (the HYDRopower Optimization Program, HYDROP) have recently been implemented at the Loveland Area...

Utilization of the Ottawa River Regulation Modeling System (MORRO)
The MORRO model was developed in Canada for use by the Ottawa River Regulation Planning Board (ORRPB) to integrate the operation of the Ottawa River during the spring freshet season, when...

Comprehensive Optimization Model for Hydroelectric Reservoir Operations
The Energy Management and Maintenance Analysis (EMMA) model is used to maximize net revenues to Manitoba Hydro considering the operation of hydroelectric and thermal generation, generation...

A Pilot Intelligent Decision-Support System for Reservoir Optimization
Various classes of knowledge used in reservoir design, planning and operations for improving the efficiency of the optimization processes are discussed in this paper. A prototype system...

 

 

 

 

Return to search