Pressure Control Studies for PG&E's 20 MW Grizzly Hydroelectric Project
The Pacific Gas and Electric Company's Grizzly Hydroelectric Project consists of a single 20 MW Francis turbine under 700 feet head located near the existing Bucks Creek Project....

Modernization of the Schoolfield Dam Hydroelectric Powerhouse
This case study describes the retrofitting of a turn-of-the-century powerhouse with modern turbine/generator equipment. The structure consists of numerous turbine bays separated by massive...

Manufacturing Planning 4 ? 440 MW Turbines Short Delivery
DBS Escher Wyss Inc. is building the largest turbines ever to be manufactured in Canada for the third expansion of the Tarbela project in Pakistan; four (4) Francis turbines each rated...

A Case Study, Large Versus Small
This paper will review the hydraulic comparisons between the Lock and Dam No. 13 Hydropower Project, a 33-MW, low-head generating station near Fort Smith, Arkansas, and the Murray Hydroelectric...

Sidney A. Murray, Jr. Hydroelectric Power Plant Turbine Hydraulic Design and Testing
This paper describes the project design concept, highlighting the choice of turbine type and capacity. Model testing and analysis of control by downstream gate is an important feature...

New Demands for Hydro Unit Inspection and Preventive Maintenance
As the hydro industry enters the 90's, special interest has been drawn to the fundamental practice of hydro unit inspection and maintenance. New demands on hydropower equipment...

Operations and Maintenance Manual for Bradley Lake Hydroelectric Project
Bradley Lake Hydroelectric Project is located on the Kenai Peninsula of Alaska. The project consists of two 63 MVA turbine-generators fed via a single 3.5-mile-long penstock. The water...

Generation Control Methods for Operating Efficiency Improvement
One way to increase the energy production of a hydroelectric powerplant is to improve the power production efficiency, that is, obtain more energy for a given quantity of water through...

Dewatering Using a Floating Bulkhead Proves Flexible, Reusable and Cost Effective
Going beyond a traditional bulkhead dropped in place with a barge crane or crane hoist, a steel floating bulkhead was conceived to dewater powerplant intakes, gated spillway bays or outlet...

Dardanelle Turbines
The Dardanelle turbines located at river mile 205.5 of the McClellan-Kerr Arkansas River Navigation System, are experiencing an unusual amount of wear in the blade trunnion bushings. Oil...

Total Quality Planning
When it comes to major unit maintenance, 'total quality results' require an investment in 'total quality planning.' The successful replacement...

Modernization of Hydroturbines?New Approach to Effectiveness, Reliability, Environment
Renovation of hydraulic turbines is one of the major lines in LMZ production and is aimed at rehabilitation of hydroturbines and increasing efficiency, rated output and energy production....

Composite Materials Show Promise for Clean Kaplan Runners
In order to prevent any possibility of oil leakage into river water, LMZ manufactured Kaplan runners containing oil in the blade servomotor only, while the blade operating mechanism operates...

Evaluation of Rehabilitation Alternatives for Small Hydropower Plants
This paper describes methods for comparative evaluation of alternative rehabilitation measures for aging small-scale hydroelectric power plants located on storage reservoirs. The evaluation...

The Unusual History of a Flowline Canal Within a Reservoir
This paper discusses the history of and remedial repairs to a flowline canal which carries water from the headwater of Lake Isabella in California to Southern California Edison Company's...

The Zebra Mussel Invasion Niagara Power Project
The zebra mussel is a prolific mollusk that has recently invaded the Great Lakes region. It has a proven track record for causing severe macrofouling at power utilities and water municipalities....

Hydro Plant Modernization and Uprating
The paper suggests that the method to achieve desirable hydropower benefits at costs lower than for new thermal projects, is through systematic modernization and upgrading of older hydro...

R. H. Saunders GS?Propeller Turbine Runner Replacement Project Outline and Model Development
Ontario Hydro's operating philosophy is to operate all of its facilities in an optimum manner. The basic rationale for upgrading this plant is to maximize its energy potential...

Robert Moses Procurement and Model Tests ? A Contractor's Perspective
This paper discusses (1) the need to provide realistic cost/benefit evaluation criteria in turbine bid specifications and (2) the benefits of competitive model testing. Recent procurement...

Rehabilitation of the Historic Ocoee 1 Hydro Power Plant
The Ocoee 1 Hydro Plant is located on the Ocoee River 16 miles east of Cleveland, Tennessee. Built by the East Tennessee Power Company, it was placed in commercial operation in 1912. There...

 

 

 

 

Return to search