LRFD: Still Waiting
Introduced in 1986, load and resistance factor design (LRFD), has a way to go before it becomes standard practice for steel design. LRFD-based design typically results in savings on gravity...

Portland's New Approach to Maintenance
The traditional if it ain't broke don't fix it approach to maintenance was not working for Portland, Oregon's two wastewater treatment plants. By...

Pumped Storage Promise
With many utilities facing potential shortfalls in generating capacity, pumped storage hydro plants could be a key to meeting peak-period energy demand in the 1990s. Pumped storage plants...

Hydroproject Risk Analysis
Traditionally, feasibility studies performed for potential hydropower sites have included either no uncertainty or at best an ad hoc value associated with estimated benefits. However,...

Probabilistic Analysis of Modernization Options
Benefit-cost analysis is a standard procedure for reaching planning decisions. Cost overruns and benefit shortfalls are also common occurrences. One reason for the difficulty of predicting...

Economic Evaluation of Minimum Flow at Rockton
The Rockton Hydroelectric Project is a two-unit, 1,100 kW plant operated by South Beloit Water, Gas & Electric Company, a wholly owned subsidiary of Wisconsin Power & Light...

A Case for Modernizing the Funding and Repayment of Regional Water/Power Projects
Several regional water/power projects authorized by Congress remain unfunded and therefore uncompleted year after year. In this paper examples of such uncompleted projects are examined....

Improving the Assessment of Instream Flow Needs for Fish Populations
Instream flow requirements are one of the most frequent and most costly environmental issues that must be addressed in developing hydroelectric projects. Existing assessment methods for...

Evaluation of an Eicher Fish Diversion Screen at Elwha Dam
In the spring of 1990, the Electric Power Research Institute (EPRI) initiated testing of an inclined fish screen installed in a 9-foot diameter penstock at the Elwha Hydroelectric Project...

A Demonstration of Strobe Lights to Repel Fish
An EPRI review (EPRI, 1986) of fish protection systems for hydroelectric facilities identified strobe lights as a potential behavioral system to minimize fish entrainment. In 1988, EPRI...

Techniques for Balancing Instream Flow Needs with Project Operation
Balancing power and non-power benefits of hydroelectric developments has become a controversial issue in the relicensing of projects. Multiple project and multiple objective flow management...

The Use of IFIM for Evaluating Effects of a Flow Alternative on Fish Habitat in a River System with Competing Water Demands
The Instream Flow Incremental Methodology (IFIM) was used to evaluate instream fish habitat in the Platte River in central Nebraska. The IFIM analysis presented herein incorporates 1)...

Altering Federal CVP Power Operations to Accommodate Fisheries' Survival on the Sacramento River
Balancing the needs of the river users, water and power users, and the fishery needs is a formidable task requiring sacrifices by all the users particularly during this time of drought...

Twin Falls Mitigation Plan: Long Term Monitoring of Fish Populations
A fishery monitoring and enhancement plan has been worked out for the Twin Falls Hydroelectric Project which diverts water from a one mile reach of the South Fork Snoqualmie River in Washington...

Instream Flow Needs Below Peaking Hydroelectric Projects
A method has been developed to assist in the determination of instream flow needs below hydroelectric projects operated in a peaking mode. Peaking hydroelectric projects significantly...

Pumped Storage, the Environment and Mitigation
The privately financed 1,000 MW Rocky Point Pumped Storage Project located in central Colorado, USA, will be one of the world's highest head, 2,350 feet (716 m), reversible...

Harvest Facility Protects and Improves Fishery
By constructing a trap and transfer/harvest facility to control anadromous fish migration, the trout fishery on the Boardman River was protected and the salmon fishery was improved. The...

Case Study: Central Oregon Siphon Power Project Mitigating Local Concerns
In the early 1980's, 18 hydroelectric projects were proposed for development on the Deschutes River system in Central Oregon. Strong local opposition was a major factor in...

Review of Mitigation Methods for Fish Passage, Instream Flows, and Water Quality
Current environmental mitigation practices at nonfederal hydropower projects were analyzed. Information was obtained from project operators on dissolved oxygen (DO) mitigation, instream...

Factors Affecting Dissolved Oxygen in Hydropower Reservoirs
Dissolved oxygen (DO) is becoming a significant issue for hydropower projects. This paper identifies some key factors that can help hydropower operators better understand the nature of...

 

 

 

 

Return to search