Precipitator Retrofit and Repair: A Case Study
Described is a difficult fossil power station retrofit project performed on a tight schedule at a congested site. Installation of a new supplementary precipitator and structural repairs...

Retrofitting Existing Fossil Plant Facilities
This paper summarizes the contents of and provides some insight into the usefulness a structural engineer will get from the publication 'Retrofitting Existing Fossil Plant...

Hydrogen?The Clean Fuel of Tomorrow is Available Today
This paper examines the role of fossil fuels and advocates a proactive energy policy to stimulate the use of domestically produced 'clean' energy carriers (fuels),...

The PowerBargeTM for Lock/Dams on Inland Waterways
Following a brief description of the prefabricated floating PowerBarge concept, the range of application and expected cost and time savings is presented. Environmental benefits are described...

Preliminary National Evaluations of CO2 Emission Controls
Under the aegis of the International Energy Agency, several countries have begun making comparable studies of the cost-effectiveness of various measures to reduce emissions of carbon dioxide...

Exploring CO2 Emissions Reduction Strategies
Concern for potential climate change resulting from the greenhouse effect may be the biggest factor in energy planning in the 1990s. A 20% reduction in CO2,...

Electric Utility Planning for Greenhouse Concerns
International concerns for the potential of significant climate change resulting from the greenhouse phenomenon have focused increasing attention on the emissions of carbon dioxide and...

Procedure for Seismic Evaluation and Design of Small Bore Piping
Simplified methods for the seismic design for small bore piping in nuclear power plants have been used for many years. Various pipe designers have developed unique methods to treat the...

Anchoring?A New Generation
During the time period of NRC Bulletin 79-02, and certainly afterwards, the use and application of wedge type anchors in Nuclear Power Plants took on a new perspective. The data gathered...

Recirculation Piping Replacement Project at Dresden Unit 3
This paper discusses the Recirculation Piping Replacement Project performed at Dresden Unit 3 during 1985 and 1986. It describes several of the technical and administrative problems associated...

Interim Spent-Fuel Storage Options at Commercial Nuclear Power Plants
Although spent fuel can be stored safely in waterfilled pools at reactor sites, some utilities may not possess sufficient space for life-of-plant storage capability. In-pool storage capability...

Design, Permitting and Initial Operation of a 32 Mw Agricultural Waste Fired Power Plant
Independent power producers are playing an increasingly important role in satisfying the electric power requirements of public utilities. Many of the independent power producers rely heavily...

The Low Temperature Engine System?Status Report
Computer simulations have shown the Low-Temperature Engine System (LTES), a breakthrough in application of long-established thermodynamic principles, to offer double digit power output...

The Future of Non-Utility Generation
The business of designing, constructing and operating non-utility owned electric power plants continues to evolve into the 1990s. The industry is consolidating as smaller market participants...

Evaluating Advanced Technologies for Acid Rain Compliance
Technological innovation in emissions control of acid rain precursors has made possible increasingly stringent control requirements for coal-fired power plants. A key challenge for potential...

Screening Emissions Control Measures
Under the new Clean Air Act, electric utilities will be able to choose from a wider range of sulfur dioxide emissions control options than in the past. Among the newly available measures...

Introduction to Structural and Mechanical Failure Modes for Nuclear Power Facilities
The three papers presented in this section discuss the types of information (i.e., dynamic tests, earthquake experience and analytical data) which are used in predicting the capacity of...

Raising of an Ash Disposal Pond by Hydraulic Filling
Commercial and industrial development around existing power plant waste disposal sites often precludes the ability to expand these sites laterally. Limitations on land availability have...

Hydropower in the Upper Ohio River Basin: A Decade of Effort at Risk
The Federal Energy Regulatory Commission (FERC) issued licenses on September 27, 1989 for construction of 16 hydroelectric projects in the Upper Ohio River Basin after up to 8 years of...

Reviewing the History and Activity of FERC
Since passage of the Federal Water Power Act in 1920 (Part I of the Federal Power Act, 16 U.S.C. 791a et seq.), Congress has required those seeking to construct, operate, or maintain hydroelectric...

 

 

 

 