Yough Hydro Case History?Development 12 MW Facility
The Youghiogheny Hydroelectric Project (Yough Hydro Project) is licensed with the Federal Energy Regulatory Commission (FERC) as Project No. 3623. The project is a run-of-the-river facility...

The PEC Headworks Project?A Cooperative Hydropower Development
The PEC Headworks Project is a single-unit hydroelectric facility located at the headworks of the Potholes East Canal at O'Sullivan Dam on the Potholes reservoir near Moses...

Technology Transfer in the Bureau of Reclamation
In addition to its traditional methods of transferring technology through reports and manuals and participation in professional and technical societies, the Bureau of Reclamation has initiated...

Net and Hydroacoustic Monitoring of Fish Passage
In 1986 EPRI published a review of available fish protection technologies for use at hydroelectric facilities. One major conclusion of that study was that fish protection systems were...

Load/Resource Matching for Period-of-Record Computer Simulation
The Southwestern Power Administration (Southwestern), an agency of the Department of Energy, is responsible for marketing the power and energy produced at Federal hydroelectric power projects...

The Wisconsin River System Operations Model: WIRSOM
The passage of the Electric Consumers Protection Act of 1986 requires the Federal Energy Regulatory Commission to give equal consideration to non-power as well as power values in hydroelectric...

A New Power Invention
Hydropower is the most natural form of energy generated in the World. It allows us to make use of our natural resources without pollution. It harnesses the basic fundamentals of nature...

Optimising Electric Power From a Small Scale Hydro Plant
The paper summarizes new development in electrical power generation from small scale hydro prime movers. It describes various methods of power generation such as CSCF (Constant speed constant...

Electrical Design Survey
In North America, a mini hydro project consists primarily of the civil works which routes water to the turbine generator and the electrical hardware necessary to interface it with a utility....

Ferroresonance & the Snettisham Hydroelectric Project
Key system features of the Snettisham power plant in Alaska will be highlighted along with a discussion of the operational problems encountered due to a ferroresonant condition. The project...

Economic Impact of Reduced High-Voltage Equipment Life
In May, 1989, the Western Area Power Administration and the Bureau of Reclamation published a report entitled Replacements: Units, Service Lives, Factors. This report showed that equipment...

Voltage Regulator Influence on Generator System Stability
During initial startup of a generator system, it is not uncommon to witness generator voltage instability. Most of the time, the solution is reduced to returning the stability control...

Design Considerations for Radial Key Retrofit
A practise that is becoming more and more common is to retrofit hydro-electric generators with Radial Key Systems. There are significant design considerations that must be made to ensure...

Varying Generator Excitation to Control Draft Tube Surge
The Bureau of Reclamation recently experimented with varying the excitation applied to a hydroelectric generator to control power swings caused by draft tube surging in a Francis turbine....

Repair of Rainbow Project Unit Number Eight
This is a case history that discusses diagnosis and correction of a AC synchronous generator problem. The problem involved loss of mechanical integrity between the generator's...

Implications of the 1987-1990 Droughts for Hydropower Generation at Reclamation Powerplants
Droughts in the western United States beginning in 1987 have caused water supply shortages and required rationing of water in some areas. The reductions in water supply have also impacted...

Evaluating Hydro Project Benefits with the POWRSYM Production Cost Model
The contribution that a hydro peaking project or pumped-storage project makes to reducing system operating costs can be determined only by modeling the project's operation...

An Improved Incremental Economic Dispatch Method for Hydroelectric Generators with Nonconvex Energy Production Cost Curves
The Bureau of Reclamation (Reclamation) has undertaken a program to improve water resource management at its hydroelectric powerplants. One feature of the resource optimization program...

Superplasticized Concrete for a Prefabricated Powerplant Structure
This paper describes the use of superplasticized concrete in extremely difficult placements inside a restricted access preassembled powerplant structure (PPS) of a 192 MW Sidney A Murray...

Evaluating History?The Edison Sault Powerhouse
The hydroelectric facility owned by the Edison Sault Electric Company at Sault Ste Marie, Michigan was an engineering marvel when it was designed and constructed. This paper explores the...

 

 

 

 