2000 Management Problems
When the year 2000 arrives, many computer programs will be unable to process the date because they are designed to recognize only the last two numbers of a given year, so that 2000, with...

Rerouting Boston's Utilities
During construction of the Central Artery/Tunnel project in downtown Boston, engineers had to move utility lines over and under both new and existing infrastructure and maintain utility...

Stabilizing the Stacks
Spenser White and Prentis designed a hybrid soil nailing system to ensure that a historic library on the Bryn Mawr, Pennsylvania, campus would not be damaged during adjacent construction...

Chemical Grouting
Technical Engineering and Design Guide, as adapted from U.S. Army Corps of Engineers, No. 24. This manual provides information and guidance for the...

Composite Construction in Steel and Concrete III
In Irsee, Germany an international conference on composite construction was held from June 9-14, 1996. It provided a forum for researchers and practitioners involved with composite construction...

Commercializing Infrastructure Technologies
A Handbook for Innovators
Prepared by the Civil Engineering Research Foundation. This report details, in user-friendly terms, the procedures necessary for successful commercialization...

Journal of Composites for Construction
The Journal of Composites for Construction publishes original research papers, review papers, and case studies dealing with the use of fiber-reinforced composite materials in construction. Of special interest...

Wireless System
The technology of using radio frequencies to communicate is not new. Ham radio and walkie talkies were the first form of radio communication used by the public; then the Citizen Band (CB)...

Construction and Maintenance
The purpose of this section is to identify construction and maintenance practices that are necessary in order to ensure that the final installation of the guyed structure adheres to the...

Turnback Project Moves Ahead
The $202 million Muni Metro Turnback (MMT) Project, scheduled for completion in September 1996, includes an 840 ft section consisting of twin steel-lined tunnels that connects to the Embarcadero...

Anatomy of a Wetland
The U.S. Army Corps of Engineers, which administers Section 404 of the Clean Water Act, requires replacement of wetlands impacted by construction. A constructed wetland in Georgia demonstrates...

Small Firms, Big Challenges
Does it pay to be small? Though many small engineering firms find strength in their size, others are hampered by limited resources and a specialization that diminishes their client base....

Construction Through Crude Oil
When the Hilltop Interceptor project in Cleveland confronted oil-saturated sandstone, designers had to rethink their shaft construction and support procedures. Among the hazards were volatile...

Catching Up on Composites
Until recently, Japan and Germany were way ahead of the U.S. in composite material technology for construction. Lighter, stronger and possibly more durable than conventional materials...

Lining the Line
Having succeeded in achieving dry stations and tunnels in mined construction, flexible waterproofing membranes are now being used to waterproof cut-and-cover subway stations and old, leaking...

Accessing Atlantic City
Construction of the 2.2 million sq ft Atlantic City Convention Center is well under way. With 486,000 sq ft of exhibition space, the center and accompanying rail terminal could help restore...

Hydroelectric Pumped Storage Technology
International Experience
This Committee report, Hydroelectric Pumped Storage Technology: International Experience, was prepared by the Task Committee on Pumped Storage,...

Capital Facelift Takes Flight
Since 1988, one of the largest and most complex airport renovation projects in U.S. aviation history has been under way in Washington, D.C. Known as the Capital Development Program, the...

Bridge Over the River Karnali
Just as topping Nepal's Mount Everest requires great stamina from mountain climbers, building the Karnali River Bridge in a remote region of western Nepal required six years...

A New Direction in Remediation
Engineers have always had to rely on wells for onsite soil and ground water remediation systems. During the past several years, horizontal drilling technology, adapted from oil recovery...

 

 

 

 

Return to search