Modern Concrete Structures Survive Romanian Earthquake
On March 4, 1977, 35 buildings collapsed during a severe earthquake (7.2 on the Richter scale) in Bucharest, Romania. Thirty-two of the 35 were older structures, erected before World War...
Dominance of Special Interests Dashes NYC Hopes for Recovery
How well is New York City doing now? Is it really on the way to recovery? Since the landmark report by the Temporary Commission on City Finances was released over a year ago, very little...
Peaking Power from Stored Air
Pumped storage has been recognized as a means of supplying additional electric power generation capacity during peak load periods for quite a while. However, such facilities are traditionally...
Lake Superior Rail-to-Water Coal Terminal Wins Outstanding Civil Engineering Achievement Award
During 1976, the nation's largest Western coal transshipment terminal, the Superior Midwest Energy Terminal, began operation in Superior, Wisconsin. This event marks the opening...
Teton Dam Failure
In June 1976, Teton Dam in Idaho failed. It was an earthfill dam 305 ft high. It failed by piping through the impermeable core of the dam. Among factors believed contributing to failure:...
Milestones in U.S Civil Engineering
Under the general titles of structures, transportation, water resources and sanitary, milestones in American civil engineering are listed in chronological order. An emphasis is placed...
Our Grand Erie Canal: A Splendid Project, A Little Short of Madness
As the first major water project in the United States, the old Erie Canal had major consequences on the economy and on civil engineering. Built in 1817-1825 to take advantage of the lowest...
Stability of Structures Under Static and Dynamic Loads
Proceedings of the International Colloqium on Stability of Structures Under Static and Dynamic Loads, held in Washington, D.C., May 17-19, 1977. Sponsored by the National Science Foundation....
Guide for Collection, Analysis and Use of Urban Stormwater Data
Proceedings of the Collection, Analysis, and Use of Urban Stormwater Data Conference held at Tidewater Inn, Easton, Maryland, November 28 December 3, 1976. Sponsored by the Engineering...
Ports '77
Proceedings of the 4th Annual Symposium on the Waterway, Port, Coastal and Ocean Division of ASCE, held in Long Beach, California, March 9-11, 1977. Sponsored by ASCE, Los Angeles Section;...
Hydraulics in the Coastal Zone
Proceedings of the 25th Annual Hydraulics Division Specialty Conference, held in Texas A&M University, College Station, Texas, August 10-12, 1977. Sponsored by Hydraulics Division...
Steel Frame, Precast Floors Meet Impossible Time Constraints
Only 13 months were allotted for expansion of the Captain Cook Hotel in Anchorage, Alaska, which meant that construction would have to continue through the winter months with little down...
Automatic Surveying � Updating Canada's Control
With Litton's
California Soon to Have Platform in 850 Ft of Water
Exxon's oil drilling and production platform, to be placed off Santa Barbara, Calif. next July, will stand in water twice as deep�� 850 ft versus about 420 ft�� as any other...
New Orleans Grows on Deep Piles
In the New Orleans area, tall buildings must be supported by piles extending at least into the preconsolidated clays at -150-ft (-46-m) or so. Settlement is much too severe and uneven...
Inverted Filter Stabilizes Soil, Stops Erosion
The inverted filter concept was invented by Karl Terzaghi to prevent dams from failing by water piping through the foundation. Laboratory and field testing have refined the necessary specifications...
Hydraulic Fill Dams/Earthquake Stability
The 1971 San Fernando earthquake near Los Angeles, Calif., generated concern for the stability of hydraulic fill dams. Two dams located near the fault were damaged severely. The shaking...
Stress Ribbon Bridge in Freiburg, Germany
A three span continuous stress ribbon bridge of 75, 130, and 138 ft, was built in downtown Freiburg, W. Germany, for pedestrian traffic. Structural analysis is similar to that of suspension...
Today's Northwest Passage
The Lower Snake River Project received the outstanding water resources engineering project award for 1976 from ASCE. The lower 140-mile (225-km) reach of the Snake River from its mouth...
Olympic Construction for Olympic Games
Montreal is preparing at full speed for the Olympic Games. The precast, post-tensioned concrete velodrome will seat 10,000. It will be available for conventions, public meetings, exhibits,...
Return to search