Model for Determining the Optimal Rehabilitation and Replacement of Water Distribution System Pipes
K.E. Lansey and L.W. Mays developed a new methodology for the minimum cost design of new and expansion of existing water distribution systems. This methodology interfaces a nonlinear programming...
Simulations of Multireservoir System Operation
Simulation modeling has evolved from a direct examination of operating policies into operational decision support systems, integrated multiple use expansion planning systems and special...
Trashrack Cleaning?A Job Requiring Utmost Care
During the last few years, the tendency in most industries has been towards more automation. Hydro has been no exception. Trashrack raking machines have followed this trend, and automatic...
Lopez-Angostura Power Tunnel
The Lopez-Angostura Project is located on the Yaque del Norte River in the Dominican Republic near the City of Santiago. A 24 m high dam, a 3.6 km long power tunnel, a pit powerhouse with...
Tunnels and Vertical Shafts for Pumped-Storage
Economic considerations are of primary importance to the planning and designing of pumped-storage in an electrical generation and distribution system. This paper deals with the optimum...
Design of Steel Tunnel Liners
The paper presents a detailed development of the fundamental equations for internal pressure design, considering an elastic interaction between the steel liner and the surrounding rock...
Design Considerations for a Penstock Located in an Outlet Tunnel at the Jennings Randolph Dam in West Virginia
The proposed production of hydropower at this flood control-recreation dam involves the installation of a 78 inch diameter steel penstock at the crown of the existing tunnel. The penstock...
Analysis and Rehabilitation of Ambursen Dams
This paper deals with the investigation and analysis of two Ambursen dams located in the upper Midwest. These investigations revealed that the original design contained significant defects,...
Dam Rehabilitation and Fish Lift Design at the Pejepscot Hydroelectric Project
The rehabilitation work on the existing rockfilled timber crib dam comprised an assessment of the existing dam stability; analysis of the existing hydraulic conditions to establish the...
A Comparative Hydraulic Model Study of an Orifice Spillway
The results of a hydraulic model study to investigate the feasibility of using an orifice spillway at a generating station in northern Manitoba, Canada are presented. It has been suggested...
J. C. Boyle Hydroelectric Project Spillway Model Study
The J.C. Boyle Hydroelectric Project is an 80 MW facility near Klamath Falls, Oregon. The project consists of a concrete canal, tunnel, parallel penstocks and two Francis turbines. Upstream...
Modeling a Small Side Channel Spillway-Model Testing Need Not Be Expensive or Time-Consuming
Effective hydraulic modeling can often be done without sophisticated laboratory equipment and instrumentation, yet provide adequate design information in less time and at less cost than...
A Design Parameter Study of Turbine Draft Tube by Viscous Flow Analysis
Viscous flow analysis based on the full Reynolds-averaged Navier-Stokes equations is being applied to predict successfully turbulent flow characteristics and energy losses in different...
Moose River Air Chamber Design and Performance
The Moose River Hydroelectric Project is a 12.5 MW development located in upstate New York. It employs an underground air chamber to protect the unit and power tunnel from pressure surges...
Hydraulic Model Tests of Flow around Penstock Suspended inside the Tunnel for Design of a Small Hydro
The proposed hydropower project in the State of Virginia involves design and construction of a steel penstock hung from the crown of an existing outlet tunnel at this U.S. Army Corps of...
Geology Related Construction Problems at the Urugua-i Hydroelectric Project
The Urugua-i Hydroelectric Project in north-eastern Argentina consists of an 80 m high roller-compacted concrete dam, 4.4 km long lateral dike, 800 m long power tunnel, and a 120 MW powerhouse....
HYOPS?Maximizing the Value of Your Hydro River System
This paper presents a microcomputer based software system, HYOPS, to optimize the operations of a series of hydro plants on a river system. The model can accommodate up to 10 plants which...
Instream Flow and Energy Production Studies for Hydro Relicensing
A methodology for assessing the effects of alternative flow release scenarios on both aquatic habitat and on energy production was utilized during instream flow studies at a 72-MW hydroelectric...
Computerized Measurement of Turbine Flow and Performance, Including Penstock Protection
The application of computer technology now makes it possible to measure turbine flows accurately, reliably and economically. The measurement is based on the differential pressure produced...
Financing and Marketing Feasibility Tests for Proposed Federal Hydroelectric Power Projects
The Southwestern Power Administration (SWPA), an agency of the Department of Energy, is responsible for marketing the power and energy produced at Federal hydroelectric power projects...