Geotechnical Thermal Analysis with a Microcomputer
A computer program entitled TDHC (Two-Dimensional Heat Conduction), based on finite element modelling, is capable of solving two-dimensional nonsteady-state heat conduction problems. These...

Comparison of Wave Overtopping Prediction to Measurements from Large-Scale Model Tests
A recent large-scale physical model study was sponsored by Arco Alaska, Inc. , to evaluate slope designs for an Arctic offshore oil drilling island. The drilling island will be located...

Validation of the CICE Code for Ice Ride-Up and Ice Ridge Cone Interaction
The discrete element method is capable of analyzing multiple, interacting, deformable, discontinuous or fractured bodies undergoing large motions and rotations. The formulation solves...

Earth Pressure on Underground Rigid Pipe in a Centrifuge
A series of centrifugal model tests on underground pipes that simulate the actual construction process were carried out to investigate the earth pressure concentration onto the pipe (particularly...

MILHY?A Microcomputer Based Hydrologic and Hydraulic Model
MILHY is an interactive, single event, lumped parameter model used to estimate streamflows and water surface profiles. The model was designed for use on basins less than approximately...

Initial Operation Model for the Central Arizona Project
A microcomputer program for operating uncompleted portions of the Central Arizona Project has been developed. Engineers may use this program daily to assist in scheduling pumping plant...

Local Pressure in Ice-Structure Interactions
Two models for the determination of local pressures during marine ice or iceberg collisions with bottom-founded structures are presented. The first model is a two-dimensional analytical...

Random Vibration Techniques
The paper presents a review of random vibration techniques for analyzing dynamic systems from the perspective of applicability to structural engineering. Problems involving linear or nonlinear,...

Watershed Management in 1985
Today's technology in subalpine watershed management is based on carefully designed watershed experiments beginning with Wagon Wheel Gap in 1909. Subsequent advances in process...

Chaparral Watershed Management: A Systems Approach
The predicted environmental and economic effects of partial chaparral conversion for increased water yield on an experimental watershed in the Prescott National Forest, Arizona, are examined...

Simulation of Hillslope Hydrologic Response to Snowmelt in Southwestern Idaho
A two-dimensional, variably saturated porous media flow model was applied to vertical hillslope cross section on a first order study basin in southwestern Idaho. The dominant source of...

Santa Barbara Hydrograph with Green-Ampt Infiltration
Numerous models are available to estimate rainfall-induced runoff from watersheds. The leading criteria in model selection is often reproducibility. Models that are reproducible are often...

The Improved SCS TR-20 Network Watershed Model
SCS Technical Release 20, 'Computer Program for Project Formulation - Hydrology' (TR-20), has been revised. Major revisions include new procedures for hydrograph...

Validation of SWRRB?A Simulator for Water Resources in Rural Basins
The three major components of SWRRB are weather, hydrology, and sedimentation. Processes considered include surface runoff, return flow, percolation, evapotranspiration, transmission losses,...

Modeling Streamflow Response from Minnesota Peatlands
A deterministic, continuous simulation model was developed to predict the effects of peatland development on streamflow. The Peatland Hydrologic Impact Model is largely physically based...

Synthetic Unit Hydrographs for Ozark Watersheds
Few concepts in modern hydrology have been more widely used and abused than unit hydrograph theory. Nevertheless, during the years since its introduction in 1932 as an extension of the...

Simulation of Natural Resource Systems
Desertification, defined as the loss in productive capacity of the land, has spawned research in decision making involving multi-objective situations. In this study, computer simulation...

Assessing Risks of Impaired Hydrologic Function
This paper describes the rationale and use of a 'resource tolerance' to evaluate hydrologic function and presents a method to establish a relative tolerance threshold...

Erosion, Productivity and Rangeland Watershed Planning
The Bureau of Land Management is responsible for the management of over 160 million acres of rangeland in the western United States. The principal uses of these rangelands are the grazing...

Modeling Off-Site Impacts
The off-site impacts of a flood water control program were evaluated by applying the SWRRB (Simulation of Water Resources on Rural Basins) model to a treated basin, primarily agricultural,...

 

 

 

 