The Water Erosion Prediction Project: Model Overview
A new generation of water erosion prediction technology is being developed by the USDA Water Erosion Prediction Project (WEPP). The WEPP models are a new erosion prediction technology...

World Bank's Role in Global Water and Related Environmental Issues
The World Bank provides loans and technical assistance to developing countries for improvement of the physical and economic well-being of the people. A major portion of its lending is...

Parameter Identifiability in Conceptual Rainfall?Runoff Models
Computers have played a major role in the evolution of hydrologic rainfall-runoff models. Besides providing the computational power required for the simulation of the complex interacting...

TVA Weekly Scheduling Model Application Experience
Development of TVA's Weekly Scheduling Model was completed in 1980. Eight years of experience covering a wide variety of applications has now been accumulated. Since the basic...

The Formation of Meandering and Braided Channels
Flow in alluvial channels implies flow past boundaries that form and deform under the action of the flow. Interaction between the flow and the mobile boundaries produces channel patterns...

An Alternative Approach to Erosion Control and Mitigation
A case study is presented in which a sediment engineering investigation was conducted to determine the potential effects of a change in flow regulation on the channel downstream of a lake,...

Reliability of Bank Protection Works Subject to Erosion
Sediment movement and changes of bed levels in natural rivers are non-stationary processes. The design of protection works for structures against erosion should account for the time dependency...

Channel Entrenchment Along the Post Creek Cutoff in Southern Illinois
The Post Creek Cutoff was constructed in 1915 by the Cache River Drainage Commission to divert flow from the Upper Cache River to the Ohio River. The construction of the cutoff reduced...

Corps of Engineers' Mississippi River Sediment Studies
In conjunction with the 1838 U.S. Army Corps of Engineers hydrographic survey of the Mississippi River, CPT A. Talcott collected sediment samples in the passes 'to determine...

Sediment Transport Model for Muddy Tidal Rivers
This paper describes the development and application of a one-dimensional mathematical model capable of simulating the changes to the cross-sections of a muddy tidal river over a time...

TVA: A Half-Century of Sedimentation Experience
The Tennessee Valley Authority (TVA) is a regional resource development agency, created by the United States Congress in 1933 and charged with bringing to the Tennessee River watershed...

Prediction of Time Development of Local Scour
The prediction of the time development of local scour is commonly solved by means of model tests. A brief description of the time-scale and the relation between the time and the scour...

Field Measurement of Topography at a River Mouth
The authors have been measuring topography and cross section at the river mouth of the Nanakita River, in Japan. Changes of short-time scale, such as straightening of the river channel...

Relationship Between Channel Migration and Radius of Curvature on the Red River
The system behavior of meanders was investigated on the Red River between Shreveport, LA, and Index, AR. The effects of plan form geometry (r/w) and erodibility of bank material on the...

Goodwin Creek Channel Morphology and Stability
Selected cross sections along Goodwin Creek channel, northern Mississippi, have been surveyed a total of twenty-one times since 1977 to document channel adjustments. Initial results of...

Alluvial Stream Bank Erosion?A 10-Year Study
Results of investigations of bank erosion along alluvial streams between 1977 and 1989 are given. Natural processes were found to dominate, with piping an important but hitherto unrecognized...

Bank Failure and Erosion on the Illinois Waterway
In 1988, bank failure and erosion on the Illinois Waterway were evaluated. Banks were inspected from the air and from a motor vessel; thirty-one sites were examined in detail. Severe erosion...

Low-Waterway and Bank Erosion in a River With Alternating Bars Bed
In a river with alternating bars bed, the banks are often subjected to erosion due to the convergent flow resulted from the bed geometry, even in a straight channel. It is known empirically...

Stream Bank Erosion and Bed Evolution Model
The graded sediment routing and stream bed evolution model of D.K. Borah, C.V. Alonso and S.N. Prasad is expanded by combining with a riverbank erosion model developed by Osman and Thorne....

Exceedance of Allowable Velocity in Bank Stability
The authors have developed a method to account for flow duration in the application of the allowable velocity method through comparison with observed bank instabilities on a river system....

 

 

 

 

Return to search