Civil Engineering in the Oceans V
This proceedings is a collection of technical papers presented at Civil Engineering in the Oceans V (CEO V) specialty conference held at College Station, Texas on November 2-5, 1992. Initiated...
Structures Congress '92
Compact Papers
These Congresses provide a forum for the practicing engineers, researchers and educators. The involvement of numerous ASCE Divisions has helped to create a program that will appeal to...
Journal of Professional Issues in Engineering Education and Practice
The Journal of Professional Issues in Engineering Education and Practice presents issues of broad professional interest and diverse views of engineering education, and professional practice. Papers examine...
Safety Factors, Loads, and Impact
The loads given in this chapter are intended for general guidance only (including wind, ice, stream flow, etc.). Maximum deflections and rotations may likewise vary with national codes....
Dome Over Orlando
The article describes Orlando's new City Hall, a 267,000 sq ft nine-story reinforced concrete tower, clad in granite-aggregate precast concrete panels and topped by a 120...
Ownership Transition: Planning for Pitfalls
The transition of a company's ownership can be a crisis caused by the retirement or sudden death of a company's owners, or an event planned for well in advance....
Water Conservation at the Antarctic Wasa Base - Results 1989-90
The Swedish WASA base was erected in the Norwegian sector of Antarctica during the 1988-89 summer season. The base was on a nunatakk and consisted of a dwelling house with full living...
A Wetlands Sewage Treatment System for the Community of Teslin
The Village of Teslin, with a population of 450, is located in south-central Yukon, approximately 180 km southeast of Whitehorse. Since 1977, the community has been trucking its sewage...
PS 5 Sewage Lagoon Embankment Stabilization
In 1981 an embankment containing a three-cell wastewater treatment lagoon was constructed adjacent to the northern edge of the Pump Station 5 gravel pad on the Trans Alaska Pipeline System....
Winter Sewer Construction in Campbell Lake
This paper discusses the winter construction for replacement of the Campbell Lake portion of the Campbell Creek C-5 Trunk (C-5 Trunk) located in Anchorage, Alaska (see Figure 1). A previous...
The Thermal Regime Surrounding a Longitudinal Edge Drain
Newton Airfield in Jackman, Maine, was constructed in 1986 to perform as a drained pavement system. The drainage design consisted of a permeable base course with a longitudinal edge drain...
Computer Predictions of Thaw Beneath Gravel Embankments on Warm Permafrost
A computer model was used to simulate the freeze-thaw effects of gravel embankments on warm permafrost typical of south-central Alaska using a one-dimensional finite-difference code, FREZ1D....
High-Performance Concrete in All-Weather Deck Pours
A high-performance concrete mix enhanced with a combination of microsilica, superplasticizer, and high dosages of an corrosion-inhibiting, accelerating admixture (calcium nitrite); proved...
Cold Climate Building Research at Wasa Base, Antarctica
During the Antarctic summer season of 1988-89 a permanent Swedish research station was erected at Dronning Maud Land, Antarctica. The station, named Wasa, is situated on a nunatak. A corresponding...
The River Ice Management (RIM) Program: Developing New Options for Waterways Operations in Winter
Most of the navigable inland waterways of the United States are utilized year-round. In northern portions of this network (mainly parts of the Ohio and Upper Mississippi River basins),...
A Shallow-Draft Icebreaker for the Upper Niagara River
The New York Power Authority (Authority) designed and built a special purpose, shallow-draft icebreaker in 1986 and 1987 for use in the upper Niagara River. The icebreaker is used during...
A Mechanistic Approach to Pavement Design for Nome Airport
The analysis of performance and design of the pavement structure for the North-South runway at Nome Airport is based on the mechanistic approach. In the mechanistic approach, calculated...
Use of Rigid Insulation Below Grade for Roadways and Parking Areas
Minnesota Power's Herbert Service Center is located 3 miles north of downtown Duluth, Minnesota. The facility, constructed in 1967, consists of primary buildings, cold storage...
Treatment of Unstable Foundation Areas in Alaska's Pavement Management System
In the State of Alaska Department of Transportation and Public Facilities Pavement Management System (PMS) unstable foundation areas are defined as sections of roadway that experience...
Minnesota Road Research Project - An Overview
The Minnesota Department of Transportation in cooperation with the Federal Highway Administration and the Local Roads Research Board of Minnesota is constructing the Minnesota Road Research...
Return to search