Financing Water Supply and Wastewater Facilities in Low Income Areas
The Texas Water Development Fund was created by amendment to the Texas Constitution in 1957 as a reaction to the droughts of the 1950's. Subsequent amendments to the Texas...

The Spirit of Bandera?An Experiment in Inter-Agency Team-Building
An experiment to improve intergovernmental cooperation in water resources planning and management was initiated by the Southwestern Division, U.S. Army Corps of Engineers, in 1988 at Bandera,...

Conservation and Water Supply Planning at Army Installations
The purpose of this paper is to summarize the research being conducted by the U.S. Army Institute for Water Resources in providing technical assistance to the Installation Planning Division,...

Wastewater Balance for Storage Pond at Land Treatment Site
Land application is an established method for treating municipal wastewater in the United States. Most land application operations include on-site facilities to store wastewater during...

Using Corps of Engineers' Reservoirs for Water Supply
This paper provides an historical overview of the Corps of Engineers (COE) authority in the water supply arena and discusses the methodologies and procedures used to reallocate storage...

Simulation of a Surface Water Allocation System
This paper outlines the water rights system in Texas and a newly developed computer simulation program for modeling this system. In addition, an overview of a river basin simulation using...

Ute Mountain Ute Indian Water Rights Settlement of 1988
The Ute Mountain Ute Tribe, located in the southwest corner of Colorado, agreed to a negotiated settlement of Winters Doctrine Water Rights rather than pursuing litigation. The Tribe will...

Administration of the Pecos River Compact Between New Mexico and Texas
The Pecos River Compact specifies the allocation of water between New Mexico and Texas. Due to difficulty in reaching agreement Texas sued New Mexico in the Supreme Court. The Court issued...

Water Rights, Water Development, & Growth Issues in Goleta, California
The Goleta Valley and Santa Barbara areas of southern California are highly desirable places to live. In the past, relatively uncontrolled growth of the Goleta Valley area led to a gradual...

Water Development Ideology: A New Status Quo
The old ideology of economic growth used to justify water resource development is no longer popular in the Southwest. A new ideology is developing, based on new circumstances....

Water for Houston: The Wallisville Case
The multipurpose Wallisville project included an industrial water supply for Houston. The project was nearly 70 percent complete when environmentalists succeeded in stopping construction...

Environmental Permitting a Major Expressway Facility in Florida
As general consultant to the Tampa-Hillsborough County Expressway Authority, Howard, Needles, Tammen and Bergendoff (HNTB) was responsible for the environmental permitting required for...

Stormwater Management Planning for the Rush Creek Watershed, Arlington, Texas
Persistent planning focused through the City of Arlington and a Citizen Stormwater Management Implementation Committee has initiated the developed of a City stormwater management program...

Lake Zephyr Watershed Stormwater Management Plan
Zephyr Creek, located near the City of Zephyrhills in west-central Florida, annually experiences flooding caused by rainfall. Development has encroached into the floodplain causing homes,...

Hydrology Review for Corps 404 Permit Process
Since 1985 the Corps of Engineers has reviewed Section 404 permit requests in regard to hydrology and hydraulic impacts of developments in the mainstem floodplains of the Trinity River...

Tucson, Arizona's 110-Year Water Resources Plan
The desert community of Tucson, Arizona, has just completed a state-mandated 110-year water supply plan. The plan includes conjunctive use of local groundwater and surface water imported...

A Methodology for Analyzing Alternative Reservoir Sizing, Shortage, and Operating Criteria
The Bureau of Reclamation's shifting emphasis from a construction oriented agency to a water management agency has initiated the development of analytical tools for estimating...

Optimization of Water Resources Allocation Using the Modsim Model
The Fraser River Basin is located in north central Colorado west of the Continental Divide in an alpine basin with elevations ranging from 8,000 to 12,000 feet. Existing permanent resident...

Applying a Simple GIS to PMP Analysis in a Microcomputer Environment
The analysis of probable maximum floods (PMF) in the Northwestern United States requires the inclusion of a snowmelt component combined with probable maximum precipitation. Traditionally...

Evaluation of Conjunctive Use and Drainage Reduction Strategies
Optimal drainage management strategies for control of salt and selenium contamination problems in the San Joaquin Valley of California must recognize subregional differences in groundwater...

 

 

 

 

Return to search