Issues in Computer Based Design/Construction Integration
Design and construction processes are widely regarded as too splintered for industry effectiveness. By improving communication and process integration, reduced costs and improved facilities...

A Model for Construction Quality and Productivity
A set of necessary and sufficient conditions for construction quality is developed. Numerical simulations are then performed to evaluate the effectiveness of various quality improvement...

Who Pays for the Unexpected in Construction??The Owner's Viewpoint
The question of who pays for the unexpected in construction cannot be answered in a way that will apply to all situations. The contract documents are the starting point for determining...

Expansion of Three Plants on the Saranac River
The capacity of three cascading hydro power plants, owned and operated by New York State Electric and Gas Corporation on the Saranac River near Plattsburgh, was expanded by a total of...

Mini/Micro Hydro Applications in Remote Off-grid Areas of Ontario
This paper outlines the potential for remote off-grid small hydro development in Ontario and the present incentives that exist to develop these resources. Estimated costs of development...

30 More Megawatts at the Don Pedro Project, Calif.
A unique and cost effective concept for installing an additional hydroelectric generating unit to an existing project in a very confined location is presented. The concept also allows...

Potential for Upgrading the Robert Moses Niagara Power Plant
This paper summarizes the feasibility of increasing the generating capacity of the Robert Moses Niagara Power Plant by replacing the turbine runners, upgrading the generators, and replacing...

Synchronous Bypass Valves for Hydroplants
The requirement that synchronous bypass valves be provided on most hydroplants and the high cost of suitable valves have created a demand for rebuilt valves. Recently, the Bureau of Reclamation...

Competitive Model Testing for Replacement Runners at the Wells Hydroelectric Project
The Wells Hydroelectric Project, located on the Columbia River, contains ten Kaplan-type turbines, each rated at 123,000 HP (91,720 kW) at a net head of 64. 9 ft. (19. 8m). The plant has...

Efficiency in Auxiliary Electrical Systems
In 1984, during the preliminary design for the proposed second powerhouse at the Corps of Engineers' McNary Dam on the Columbia River, the more recent improvements and techniques...

Sewage Plant Engineered for Value
The Camden County (NJ) Municipal Utilities Authority was formed in 1972 to cope with suburban growth that had overloaded 34 primary treatment plants. By the early 1990s, the Authority...

Sensing by Satellite
Commercially available data collected by U.S. and French satellites re helping civil engineers take a closer look at our planet. Also available are PC-based image processing systems that...

Construction of Elk Creek Dam
Construction of Elk Creek Dam, located in Southwest Oregon, is currently underway with completion scheduled for September 1988. The main dam contract was awarded to Ohbayashi Gumi Ltd....

Socio-Economic Issues in Financing Water Resources Development Compared to Non-Structural Alternatives
Like the hydrologic cycle, financing water resources development requires a holistic view of the technical, legal, institutional (social and economic) factors before alternative selection....

Vacuum Sewers: Construction and Operating Experience
As an alternative to conventional collection, the vacuum system has many advantages. Smaller diameter pipes, shallower trenches and the ability to make vertical and horizontal field changes...

Alternating Direction Oxidation Ditches?A Cost Saving Technology from Denmark
A soon to be released EPA report claims that in Denmark, small alternating direction oxidation ditches (ADOD) save as much as 70% of the cost for conventional oxidation ditches. The alternating...

Comprehensive Rehabilitation Results From Stege Sanitary District
Seven sewer agencies, including Stege Sanitary District, in the East Bay of the San Francisco Bay Area embarked on a 20-year capital improvement program in 1987. The 300 million construction...

Distribution System: Cost of Repair and Replacement
The Safe Drinking Water Act of 1974 mandates that EPA be concerned with the supply of potable water to the consumer. Although most emphasis has been placed on water quality as it leves...

Costing Contingencies
Estimating the cost of constructing a tunnel is an art rather than a science. The unknowns are too great to predict costs relianblbly. On the other hand, owners need cost estimates in...

Quality: Out of the Manual and Into the Field
The intent of ASCE's Manual of Professional Practice for Quality in the Constructed Product, Preliminary Edition for Trial Use and Comment...

 

 

 

 

Return to search