Status of Tampa's Downtown People Mover
There are currently three People Mover Systems either in the planning stage, construction stage, or operational stage in Tampa. Tampa International Airport has had a Westinghouse Shuttle...
Joint Use Right-of-Way Agreements for the Miami Metromover System
This paper presents an overview of the right-of-way acquisition process for the Miami automated people mover system (METROMOVER). The cost associated with the acquisition of the necessary...
Station Design Approach to Peoplemover System
This paper examines some of the real issues that face the planners and designers of tomorrow's urban people movers. Concerns such as the urban context of the Miami METROMOVER,...
Design and Fabrication of the Guideway Superstructure for the Miami METROMOVER
The guideways for the driverless rubber-tired vehicles are entirely aerial. As a result of severe restrictions on horizontal alignment and pier locations imposed by the downtown Miami...
Downtown People Mover System Security: Detroit and Miami Responses
The Detroit and Miami downtown people mover (DPM) systems will be in uncontrolled environments in major urban central business districts. Both plan not to have personnel on vehicles or...
Downtown People Mover Operating and Maintenance Personnel Requirements
Two major automated Downtown People Mover (DPM) projects, Miami and Detroit, are expected to be in operation within a year. These two DPM systems are similar in many respects: automation,...
Rigid Pavement Rehabilitation: Interstate 95?Duval County, Florida
Rehabilitation studies have been conducted on Interstate 95 in Duval County, Florida. The rigid, unreinforced pavements were constructed in the late 1950's and 1940's....
Control of the Design Process
Gilbert/Commonwealth, Inc. (G/C) was the architect-engineer for the original design of the Florida Power Corporation (FPC) Crystal River Nuclear Plant, Unit 3 (CR3) and has been involved...
Development of Flood Peak Regression Equatins for Small Watersheds in Southwest Florida
Hydrologic investigations were performed on the Belle Meade-Royal Palm Hammock area in Collier County, Florida. The study area, encompassing approximately 79 square miles (205 km**2),...
Subarea Transportation Planning on Micros
This paper describes the adaptation of the regionwide travel forecasting models developed for the Orlando Urban Area Transportation Study (OUATS) for application at the subregion and subarea...
Tampa Does It with Mirrors
As one of the nation's fastest growing cities, Tampa needed far more public works dollars. But the traditional source, the real estate tax, can no longer be relied on so heavily,...
Monitoring of an Ocean Dredged Material Disposal Site
The Tampa Harbor Project involves deepening and widening approximately 50 miles of existing shipping channel in Tampa Bay, Florida, with the removal of approximately 70 million cubic yards...
Charlotte Harbor Beach Nourishment
The project consisted of dredging approximately 300,000 cubic yards (229, 380 cubic meters) of material, utilizing a seagoing hopper dredge, from the entrance channel of Charlotte Harbor,...
Offshore Dredging - Is it still Cost Effective for Beach Restoration?
Offshore dredging has been the source of sand for beach restoration in southeast Florida since Broward County constructed the first project in Pompano Beach in 1970. However, with increasing...
Long-Term Maintenance Dredging Permits - Florida's New Approach to Regulation
Previous approaches to regulating maintenance dredging activities in Florida generally have been myopic and failed to gather information that adequately reflects the needs for environmental...
Long-Term Maintenance Dredging PermIts--Florida's New Approach to Regulation and Its Implications for Federal, State, and Local Reforms
Florida has developed a long-term maintenance dredging permit process to reduce problems in obtaining regulatory approvals. Under Florida's new program, the term of the permit...
Engineering for Beach Restoration Dredging
Beach restoration utilizing offshore dredging has proven to be the most economical way to restore beaches in Florida. There have been over a dozen projects constructed using this method...
Tampa Harbor Florida Deepening Project
Tampa Harbor is one of the largest dredging projects ever undertaken by the Corps of Engineers. The major features of the deepening project which presented the greatest problems were the...
Planning and Management of Disposal Areas
Passage of the Clean Water Act of 1977 required federal agencies to obtain either water quality certification or a waiver from the state for the discharge of dredged or fill material into...
Environmental Management Problems of Dredged Material Islands in the Tampa Bay Area
Between 1977 and 1982, four new islands were created in Hillsborough Bay as part of the Tampa Harbor Deepening Project. The islands are now 3-7 years old. They exhibit striking differences...