Design and Implementation of a Multi-Faceted Site Remediation
This technical paper presents a case history of the design, construction, and start-up of a multi-faceted site remediation system. The case history includes a description of the site background,...

Surface Bypass-Collector Concepts and Performance
Surfacetype bypass collectors and concepts are described. Biological and engineering requirements to pass juvenile salmonids at Snake?Columbia River dams are presented. The components,...

Advanced Seawater Desalination Plant
A project that will demonstrate an enhanced seawater desalination process that operates in combination with upgraded existing coastal power plants to meet part of the projected water needs...

Groundwater Monitoring For a Tunneling Project
The Groundwater Monitoring and Management Plan, developed for the proposed tunnel reaches between Devil Canyon and City Creek, monitors and manages selected water resource features within...

Value Engineering Changes to the Eastside Pipeline
Value Engineering is a process of applying analytic, creative and evaluative techniques to a project in order to make recommendations that will, when implemented, maximize value and quality...

The Secondary Inlet of the Eastside Pipeline Project
The subject of this paper is a design feature included in the current capital improvement program of the Metropolitan Water District of Southern California. This feature, the Secondary...

Impact of Sedimentation Caused by Runoff
As water is pumped into a reservoir, sedimentation caused by runoff can be an important factor in the reservoir's storage capacity. This report discusses various studies conducted...

Concept Ecology Integrated Project Engineering and Environment; Relating a Project to the Surroundings
The selected alignment of the 27.3 km long Veterans Expressway in Tampa, Florida was constructed for better access to the downtown area from a relatively rural but fast growing area of...

Environmental Improvement in Southern Africa
Cross-border environmental projects in southern Africa are identified and discussed. The complexity of coordinating multinational standards, combined with the region's extreme...

White River Fish Screen Project Planning and Design
In 1983, Puget Sound Power and Light Company (Puget Power) submitted a license application to FERC for the overall White River Project. One of the elements of the project application was...

The Use of Monitoring of Russian Water Objects for the Decrease of Disaster Consequences
The project of the United States Monitoring System for Water Resources was created. This system united the possibilities of different kinds of existed systems for observation of water...

Risk as a Sustainable Development Criteria
Project alternatives can be compared on a relative basis when all factors contributing to social, environmental and economic risks are weighed by all the stakeholders concerned. It is...

Design and Construction of the Santa Ana River Wash Crossing of the Inland Feeder
The Inland Feeder Pipeline passes beneath the Santa Ana River in Southern California. The flood plain of the river provides the habitat for two endangered species and to avoid surface...

The Management and Policies of the BECC
The purpose of the Border Environment Cooperation Commission (BECC) is to help preserve, protect, and enhance the environment of the border region in order to advance the well-being of...

Floodplain Analysis of the Lower Santa Margarita River in Camp Pendleton Marine Air Base, California
Floods of 1993 caused extensive flooding of the Santa Margarita River, and significant damage to Camp Pendleton. A floodplain analysis was performed including an assessment of recent flood...

Engineering Aspects of Wetland Mitigation
Wetland mitigation demands a multi-disciplinary engineering approach, and a systematic collection, evaluation and analysis of data. The design of a constructed wetland addresses these...

Santa Ana River Mainstem Project
The Santa Ana River Mainstem Project consists of seven major features including the construction of 550 ft. high earth and rockf ill dam; raising the embankment by 28 feet of Prado Dam,...

Benefits of the Santa Ana River Mainstem Project
1. Need for additional flood control in Orange County. A. Orange County flood history. B. Increasing Population and development. C. Santa J River flood threat today. 2. How the Santa Axia...

Problem and Technical Solutions: The Seven Oaks Dam, Physical Elements of the Seven Oaks Dam Feature
Seven Oaks Dam is located in the upper Santa Ana Canyon approximately 1 mile from the canyon mouth. The site is 8 miles northeast of the city of Redlands in San Bernardino County on the...

Central Artery/Tunnel (CA/T) Project Environmental Permitting
The Central Artery/Tunnel Project is one of the largest public infrastructure projects in the United States. As such it poses major environmental planning and design challenges. The environmental...

 

 

 

 

Return to search