Threaded Rebars Spin Down Time
A rebar splicing technique was a major factor in saving two year's construction time on California's $33 million, 9000 ft (2743 m) Antioch Bridge. Rebar splicing...

State-of-the-Art Report on Air-Supported Structures
A structure with a structural system which is dependent on pressurization, either positive or negative, is termed a pressure preloaded structure. Most pressure preloaded structures intended...

Pipelines in Adverse Environments
A State of the Art
The Conference us designed to establish communications between designers and users. The subjects covered are: Pipelines in the Ocean - design, construction and inspection; Routing, design...

Current Trends in Design and Construction of Embankment Dams
This report is concerned primarily with the embankment itself although foundation and abutment treatment are considered essential elements of the embankment. It covers a broad range of...

PERT and CPM Techniques in Project Management
Originally published in Journal of the Construction Engrg. Division, Vol. 90, No. 1, March 1964, pp. 1-26...

Installation Procedure for Hot Metal Facility
Originally published in Journal of the Construction Engrg. Division, Vol. 91, No. 1, May 1965, pp. 179-190...

Critical Path Resource Scheduling Algorithm
Originally published in Journal of the Construction Engrg. Division, Vol. 94, No. 2, October 1968, pp. 161-180...

Planning Monitoring Frequencies for CPM Projects
Originally published in Journal of the Construction Engrg. Division, Vol. 97, No. 2, November 1971, pp. 211-226...

Project Planning and Scheduling: Unified Approach
Originally published in Journal of the Construction Division, Vol. 99, No. 1, July 1973, pp. 45-58...

Progress Model for Construction Activity
Originally published in Journal of the Construction Division, Vol. 100, No. 1, March 1974, pp. 59-64...

Networking Methods for Project Planning and Control
Originally published in Journal of the Construction Division, Vol. 100, No. 3, September 1974, pp. 357-372...

Network Analysis and Construction Planning
Originally published in Journal of the Construction Division, Vol. 100, No. 3, September 1974, pp. 203-210...

Planning Construction of Repetitive Building Units
Originally published in Journal of the Construction Division, Vol. 100, No. 3, September 1974, pp. 403-412...

New Methods in Construction Systems
Originally published in Journal of the Construction Division, Vol. 100, No. 3, September 1974, pp. 211-222...

Stochastic Scheduling of Linear Construction Sites
Originally published in Journal of the Construction Division, Vol. 100, No. 4, December 1974, pp. 571-587...

Developments in CPM, PERT, and Network Analysis
Originally published in Journal of the Construction Division, Vol. 101, No. 4, December 1975, pp. 769-784...

Conceptual RMC/Time Synthesis
Originally published in Journal of the Construction Division, Vol. 102, No. 2, June 1976, pp. 307-323...

Probabilistic Time Scheduling
Originally published in Journal of the Construction Division, Vol. 102, No. 3, September 1976, pp. 415-423...

Cost and Time Scaled Networks: Graphical Model
Originally published in Journal of the Construction Division, Vol. 103, No. 2, June 1977, pp. 179-190...

Discussion of Cost and Time Scaled Networks: Graphical Model
Originally published in Journal of the Construction Division, Vol. 103, No. 4, December 1977, pg. 670...

 

 

 

 