Threaded Rebars Spin Down Time
A rebar splicing technique was a major factor in saving two year's construction time on California's $33 million, 9000 ft (2743 m) Antioch Bridge. Rebar splicing...
State-of-the-Art Report on Air-Supported Structures
A structure with a structural system which is dependent on pressurization, either positive or negative, is termed a pressure preloaded structure. Most pressure preloaded structures intended...
Pipelines in Adverse Environments
A State of the Art
The Conference us designed to establish communications between designers and users. The subjects covered are: Pipelines in the Ocean - design, construction and inspection; Routing, design...
Current Trends in Design and Construction of Embankment Dams
This report is concerned primarily with the embankment itself although foundation and abutment treatment are considered essential elements of the embankment. It covers a broad range of...
PERT and CPM Techniques in Project Management
Originally published in
Installation Procedure for Hot Metal Facility
Originally published in
Critical Path Resource Scheduling Algorithm
Originally published in
Planning Monitoring Frequencies for CPM Projects
Originally published in
Project Planning and Scheduling: Unified Approach
Originally published in
Progress Model for Construction Activity
Originally published in
Networking Methods for Project Planning and Control
Originally published in
Network Analysis and Construction Planning
Originally published in
Planning Construction of Repetitive Building Units
Originally published in
New Methods in Construction Systems
Originally published in
Stochastic Scheduling of Linear Construction Sites
Originally published in
Developments in CPM, PERT, and Network Analysis
Originally published in
Conceptual RMC/Time Synthesis
Originally published in
Probabilistic Time Scheduling
Originally published in
Cost and Time Scaled Networks: Graphical Model
Originally published in
Discussion of
Originally published in
Return to search