A Review of Design Criteria for High RCC Dams
The 1980s could be considered to be the decade during which roller-compacted concrete dams came of age. This economic method of construction is sufficiently proven that very large dams...
Lessons Learned from Elk Creek Dam
This is the third of a series of papers published on the design and construction of Elk Creek Dam. The first paper discussed design and construction concepts to provide water tightness...
RCC Dam Construction?A Contractor's View
A contractor's view of RCC dam construction is presented. It begins with the principal construction elements and the challenge created by their interrelationships. Men and...
Construction of Urugua-I RCC Dam
Considerations concerning the RCC construction process and its relation with the design and quality are analyzed. The paper contains topics related to the experience obtained at Urugua-i...
RCC Dam Design Concepts Versus Construction Conditions for Stagecoach Dam
The Stagecoach RCC dam was constructed using current state-of-the-art knowledge and the geotechnical approach to roller compacted concrete (RCC) mix design. The design was prepared in...
RCC Test Specimen Preparation?Developments Toward a Standard Method
As there is no widely recognized standard for the preparation of laboratory test specimens for roller compacted concrete (RCC) mixtures, criteria for developing such a standard are listed....
Thermal-Structural Analysis Methods for RCC Dams
Current procedures for evaluating temperature control and the placement of contraction joints in roller compacted concrete dams are not always evaluated with the aid of detailed analysis...
Final Design and Construction of Gibraltar Dam Strengthening
The results of a 1983 safety evaluation of Gibraltar Dam indicated that the dam did not meet seismic safety standards. A remedial scheme involving the addition of a roller compacted concrete...
Rehabilitating Small Earth Embankments with RCC
The rehabilitation of existing earth dams using roller compacted concrete (RCC) is gaining wider acceptance in the engineering and construction community. Presented herein is a discussion...
Principles of Holistic Medicine Applied to Infrastructure Maintenance: A Test Case
A humorous consideration of the question of whether holistic medicine�that is, the treatment of the entire physical and emotional configuration of the patient instead of the solely medical...
Designing Reinforced Rock
The reinforced rock arch design method has been used to stabilize coal mine excavations for 40 years, but so far has been applied to only a few tunnels. The use of rock reinforcement develops...
The Heartbeat of the Artery
One of the most ambitious infrastructure megaprojects in recent memory, Boston's $5 billion Central Artery runs the gamut of civil engineering disciplines. Design, highway,...
Staffing Up for a Major Program
A nine-member construction management section must pilot a $335 million, multi-project capital improvement program over the next five years. Should construction management duties automatically...
Numerical Beach Profile Modelling for Beachfill Projects
The use of beachfill in addressing coastal erosion problems is becoming increasingly popular. It is often more attractive than the conventional structural approaches for economic, aesthetic...
Experience with Beach Fill Equilibration and Recommended Design Guidelines
Well documented engineering procedures suitable for determining design berm dimensions subsequent to profile equilibration appear to be lacking. Failure to properly account for cross-shore...
Hampton, New Hampshire: Beach Nourishment Project
An ongoing program of beach nourishment at Hampton Beach, Hampton, New Hampshire is a success and has resulted in long term use of a recreational facility at one of the most popular resorts...
Beach Nourishment with Aragonite and Tuned Structures
The first full-scale use in the United States of imported aragonite sand for beach restoration was undertaken at Fisher Island, Florida, between December 1990 and April 1991. About 20,000...
Sea Defence System at Herne Bay, England
This paper reviews the investigations carried out into the design of the proposed now sea defences fronting the central area of Herne Bay on the North kent coast. The existing defences...
Monitoring of the 1988 Boca Raton Beach Nourishment Project
During July and August of 1988, approximately 843,000 cm of sand was placed along a 2.3-km stretch of beach in Boca Raton, Florida. Post-cosntruction monitoring of the beach nourishment...
Mitigation of Harbor Caused Shore Erosion with Beach Nourishment Delayed Mitigation, St. Joseph Harbor, MI
St. Joseph Harbor MI. was the first Corps of Engineers Section 111 erosion-mitigation project to be built. Between 1 Jun 76 and 5 Aug 85, about 1,067,000 cy of fine sand was placed in...