Knowledge-Based Expert System for the Real-Time Operation of Reservoir Systems
An efficient way to avoid the loss of valuable knowledge is to develop an expert system which incorporates hydrologic, hydraulic, system analysis, environmental, economical knowledge based...

Evaluating Uplift Pressures for Concrete Gravity Dams
An approach for evaluating uplift and dam foundation conditions, which resulted from the initial phases of an Electric Power Research Institute (EPRI) study is presented. An earlier study...

Experience with the Application of Fully 3D Potential Flow Analysis to Runner Design
Hydraulic turbines come in various shapes and types depending on their operating conditions. Their performance characteristics depend largely on the runner which is the most difficult...

Guidelines for Failure Investigation
The Guidelines for Failure Investigation by the Task Committee on Guidelines for Failure Investigations of the Technical Council on Forensic...

Cautious Risk Taking
Traditionally, the design engineer could bear virtually unlimited liability for design failure. Now he is less vulnerable. The concept is less than 20 years old, but since the early 70s,...

Grouting Trends
The grouting industry is discussed and North American practice compared to European practice. There has been more innovation in this field overseas, but there have also been failures....

The Race for Smart Cars
Prendergast describes the technological elements involved in Intelligent Vehicle/Highway Systems (IVHS), current programs in Europe, Japan and the U.S. aimed at implementing IVHS systems,...

Affordable Housing
a Challenge to Civil Engineers
This conference proceedings, which consists of 25 papers presented at the National Conference on Affordable Housing held in Miami, Florida on December 6-8, 1989, discusses ways that the...

Specification as a Requirement for Hot Mix Asphalt
A brief description of the current national research programs that affect the development of specifications is included in this paper. Elements of the Strategic Highway Research Program...

Real-Time Project Tracking
Too often project tracking is based on a job costing program which charges costs to the project based upon invoices from vendors and payrolls of employees. The information obtained from...

Potential Misuse of Construction Scheduling Software
The advent of microcomputers, coupled together with the development of many easy to use and economical scheduling packages, has placed a very powerful tool in the hands of construction...

Real-time Monitoring of Heavy Equipment in Open Pit Mines
This paper reports on a system with local intelligence to interpret on-board signals. Existing sensors, pressure switches, warning lights, relays, and on-board monitoring systems provide...

Effect of Planning Errors on Construction Safety
A discussion of the planning phase of the building process associated with all the activities that are accomplished during this phase is presented. The different types of errors that occur...

Eliminating Bias in Construction Schedules to Measure Time
Schedules developed for use in managing the construction process which are accurate for that use are not necessarily sufficiently accurate to measure and evaluate delays and changes to...

Project Control Via Acoustical Sensing
This paper describes ongoing research into automating the process of collecting project control information using acoustical sensing devices. The paper describes how frequency spectra...

Decision Support System for Achieving and Measuring Design Effectiveness
A microcomputer program is developed to serve as a decision system for improving design effectiveness. The program, called 'Design Effectiveness Evaluation and Implementation...

Pumped-Storage: An Analysis of Optimal Capacity
This paper presents a systems analysis procedure to evaluate planning alternatives for pumped-storage operated in an existing power system. This procedure can be used by planners and engineers...

Federal Vs. Non-Federal Hydroelectric Development
This paper presents the methodology and results of economic and financial analyses that were performed to indicate the optimum size powerplants that would be constructed assuming Federal...

Actual Vs. Expected Performance of Small Hydro Projects
This paper presents the results of several case studies of small hydro projects that compare the expected performance with the actual performance as measured in terms of energy generation....

The Uses of CADD in Hydropower Development
The hydropower community needs inexpensive methods to thoroughly and quickly analyze the siting of hydroelectric projects. Computer-aided design and drafting (CADD) and programs like HYSIZE...

 

 

 

 