Compaction Grouting Stops Settlement of an Operating Water Treatment Plant
In early 1978, about a month into full-time operation, the new filter plant building for the water treatment plant for the City of Glenwood Springs, Colorado, experienced distress due...
Soil Improvement to Mitigate Settlements under Existing Structures
Settlements of sites with existing structures are more difficult to mitigate than those of sites without structures. Equipment access, work area, noise, dust, vibrations, and cost are...
A Comparison of Three Soil Improvement Techniques to Densify Liquefaction Susceptible Sands
Deep soil densification programs using vibratory probe compaction, vibro-replacement and terraprobe methods have been completed on a naval submarine base to limit potential settlements...
Collapse Mechanism of Compacted Clayey and Silty Sands
The mechanism of wetting-induced collapse (hydrocompression) and the influence of fines ratios on compacted sandy soils are investigated. Various ratios of clay and silt are mixed with...
Settlement of Compacted Fills Caused by Wetting
Post-construction wetting of fills can cause swell or compression, depending on soil composition and stress conditions just before wetting. The various factors affecting swell/compression...
Case History of a Collapsible Soil Fill
Collapse settlement of a deep compacted fill led to damage of a group of condominium units. The fill consisted of a highly heterogeneous mixture of coarse- to fine-grained soil containing...
Settlement of Peats and Organic Soils
New advances in investigation of settlement of peats and organic soils and issues related to construction over such soft ground are presented. Peats and organic soils are well known for...
Comparison of Headcut Advance Testing and Soil Test Results
This paper presents the results of a study conducted in a flume to determine headcut advance rates of two base soils compacted at various compaction moistures and placement energies. The...
Energy Dissipation for a RCC Stepped Spillway
A two-dimensional physical model study was used to quantify the kinetic energy dissipation of the steps in a roller compacted concrete (RCC) stepped spillway. The steps were effective...
Bed Load Prediction in Steep Mountain Rivers
The characteristics of the stream channel morphologies in a very steep mountain ravine are explained by the data obtained through the longterm field observation. The bed load transportation...
Velocity Control Rings for RC Pipe on Steep Slopes
This paper discusses the use of internal concrete rings to reduce velocity and concrete erosion for reinforced concrete pipes on steep slopes in the Southern California area....
Investments in the Future
The projects that earned the 1994 Outstanding Civil Engineering Achievement Awards of Merit were improvements to the nations transportation and environmental infrastructures. On the outskirts...
Chicago's Waterfalls
The 1994 Outstanding Civil Engineering Achievement Award goes to successful implementation of an elegantly simple idea: aerate sluggish water by letting it fall through man-made waterfalls....
Alternatives for Overtopping Protection of Dams
Prepared by the Task Committee on Overtopping Protection of the Hydraulics Division of ASCE. This report summarizes the results of an inventory and...
Standard Practice for Direct Design of Buried Precast Concrete Pipe Using Standard Installations (SIDD)
This publication, Standard Practice for Direct Design of Buried Precast Concrete Pipe Using Standard Installations (SIDD), (ASCE 15-93), is applicable to buried concrete precast pipe intended...
Advances in Cement and Concrete
This proceedings,
RCC For Seismic Design
Throughout its 70-year existence, the Littlerock Dam in Southern California's National Forest has been the subject of concern. Located only 1.5 mi south of the San Andreas...
Chicago Automates Expressway Lanes
Chicago motorists will soon reclaim another rebuilt expressway in October with substantial completion of a $450 million, 7.5 mi portion of I90/94, the John F. Kennedy Expressway. The two...
Environmental Campus for EPA
Green design, fiscal responsibility and a new Corps of Engineers value engineering program come together in EPA's $240 million new central research campus to be built in North...
Cement Manufacture and Use
This book,
Return to search