Public Education, Public Confidence, and Public Acceptance of Radioactive Waste Management Facilities
This paper critically examines the conventional assumption that public opposition is a function of public illiteracy and emotionalism by reviewing recent articles on radioactive waste...
MRS Transfer Facility Feasibility Study
Under contract to the U.S. Department of Energy, Parsons was requested to evaluate the feasibility of building a simple hot cell (waste handling) transfer facility at the Monitored Retrievable...
Industry Experience and Programs that Benefit the Monitored Retrievable Storage (MRS) Facility Design
The design objectives and criteria for an MRS must be responsive to the needs and concerns of the public and the industry. It is shown here that to the maximum extent, existing industry...
Opting for Cooperation?A Case Study in Siting a Low Level Radioactive Waste Management Facility
In 1986, the Canadian federal government called a halt to efforts by a crown corporation to site a low-level radioactive waste management facility when it became apparent that continuation...
Transportation Capabilities of the Existing Cask Fleet
This paper describes a number of scenarios estimating the amount of spent nuclear fuel that could be transported to a Monitored Retrievable Storage (MRS) Facility by various combinations...
Some Political Logistics of Nuclear Waste
The need for a centralized, federal, interim storage facility for nuclear waste, or MRS, alledgedly has become more urgent because the date for the opening of the permanent repository...
Evaluation of Storage/Transportation Options to Support Criteria Development for the Phase I MRS
The Department of Energy's (DOE) Office of Civilian Waste Management (OCRWM) plans to develop an interim storage facility to enable acceptance of spent fuel in 1998. It is...
Interim Waste Storage for the Integral Fast Reactor Fuel Cycle Demonstration
An interim storage system design and operating strategy were developed for implementation in the Integral Fast Reactor Fuel Cycle Demonstration. Waste characteristics and thermal power...
Compaq Center East Water Management Plan
This Water Management Plan attempts to balance the many goals which were established in the Master Plan. Major areas of natural vegetation have been preserved. Stormwater quality pond/wetland...
A Prototype Distributed Processing System Water Control Data Processing at Tulsa District U.S. Army Corps of Engineers
The Tulsa District, Corps of Engineers operates 50 multi-purpose reservoirs controlling runoff from all or parts of 7 states. These reservoirs are operated for flood control, water supply,...
Downstream Danger from Sudden Discharges of Water
The sudden, unexpected release of water by hydropower facilities poses a threat to fishermen and boaters immediately downstream. The characteristics of the danger can be identified, however,...
Devil's Gate Multi-Use Project and Urban Water Resource
Not since Congress passed the 1902 Reclamation Act has there been an opportunity for a water resources project to make such an instrumental impact on the environment. Historically, damming...
Sediment Impediment to Boat Launching at Miller Park, City of Avon Lake, Ohio
In 1987 a boat launching facility was constructed at Miller Park, in the City of Avon Lake, Lorain County, Ohio (Figure 1). There have been problems with sediment buildup ever since it...
Wetland Valuation Based Upon Multi-Purpose Performance Evaluation
Wetland protection and restoration have become a top priority in water management. A wide variety of benefits are ascribed to wetland protection, e.g., flood control, water quality improvement,...
Drainage Design Criteria: Too Restricted? Too Broad? Too Outdated?
Should drainage design policies be more flexible, leaving the field more open to engineering judgment? Are some policies too loose or broad? Should design criteria more closely reflect...
Presentation of Case Study and Identification of Special Interest Groups
A typical example facing the National Park Service is presented that demonstrates the diversity in objectives associated with water resources decision making in an environmentally conscious...
Live Demonstration with Attendees Participation
An application of multi criterion decision making is demonstrated in an interactive environment with Conference participants attending this session. A common problem facing water resources...
The Managemet of Storm Water Runoff Associated with Industrial Activity
Section 405 of the Water Quality Act of 1987 mandates that municipal and industrial storm water discharges are point sources of water pollution and are subject to regulation under the...
Hurricane Hugo's Effect on Marina Structures
The author has visited over twenty-five sites along the South Carolina coast and in Puerto Rico to ascertain the effects of Hurricane Hugo on marina facilities. Types of structures evaluated...
Structural Engineering Lessons Learned From Hurricane Hugo
Hurricane Hugo purported to be 'The Storm of The Century' caused considerable property damage over a tremendously large area effecting nearly everyone and every...