The Construction of the Sidney A. Murray, Jr. Hydroelectric Power Plant
The project, consisting of eight 8.2m bulb turbines rated at 192MW, is located in the State of Louisiana and will use a portion of the water diverted from the Mississippi River to the...

Electrical and Mechanical Design, Commissioning, and Performance of the Moose River Hydroelectric Project
The Moose River Hydroelectric Project is a single-unit run-of-river hydroelectric facility located near Lyonsdale, New York, and was developed by a private firm. The generating equipment...

Crest Gates Design for Upper Mechanicville
This paper describes the design of flap-type spillway crest gates for the Upper Mechanicville Project, located on the Hudson River near Mechanicville, New York. These gates are being provided...

Vibration Problems of Penstock Piping for a Vertical Tubular Hydraulic Turbine
Excessive vibration amplitudes were experienced in the vertical gated tubular units at the Great Falls Hydroelectric Project located in the City of Paterson, New Jersey. Vibration amplitude...

Turbine Runner Procurement for the Robert Moses Niagara Power Plant Upgrade
Procurement of the new runners involved the selection of two manufacturers who have entered into a design competition in which competing models will be tested in an independent hydraulic...

Field Efficiency Tests of a Large Pump-Turbine
The New York Power Authority's Blenheim-Gilboa Pumped Storage Project began commercial operation in 1973. In 1987, the Authority initiated a study of the existing pump/turbines...

Acoustic Flowmeter/Efficiency System Installation at the Niagara Power Project
The New York Power Authority's Robert Moses Niagara Power Project (RMNPP) recently installed an acoustic flowmeter/efficiency system on two 150 MW rated generators. This paper...

Crescent and Vischer Ferry Hydroelectric Redevelopment Projects
The owners of aging small hydro plants face a myriad of complex technical, economic, and regulatory challenges as they seek to reliance and prepare their projects for continued operation...

Pumping System Permits Diversion of Water River Dam
For project construction at an existing Corps of Engineers' dam in New Mexico, where modifications to the existing outlet works were performed, a barge-mounted pumping system...

Fluctuating Pressure Measurements on a Large Hydro Turbine
The New York Power Authority is investigating the feasibility of upgrading the thirteen 150,000 kW turbines-generators at the Robert Moses Niagara Power Station to improve efficiency and...

Renewal of the Burt Dam Generating Station
The present redeveloped hydro facility operates as a 300 kW run-of-river station automated by a head pond level controller which adjusts turbine setting to match available river discharge....

Resident Engineering Costs vs. Construction Costs for New York City Water Pollution Control Projects
This paper begins by describing the New York City fresh water system, water pollution control plants, and the development of capital programs. It then discusses contracting methods, construction...

Expansion of Three Plants on the Saranac River
The capacity of three cascading hydro power plants, owned and operated by New York State Electric and Gas Corporation on the Saranac River near Plattsburgh, was expanded by a total of...

Licensing a Hydroelectric Power Plant at Navajo Dam
A hydroelectric power plant at the base of Navajo Dam was envisioned by the Bureau of Reclamation and the Bureau of Indian Affairs to support the development of the Navajo Indian Irrigation...

Repair of The Hinckley Dam Embankments
The New York Power Authority was licensed in 1982 to construct and operate a 9 Mw hydroelectric facility at the existing Hinckley Dam near Utica, New York. Soil exploration programs undertaken...

New Martinsville Hydroelectric Project
The 34MW New Martinsville Hydroelectric Project is presently under construction in West Virginia. Located at Hannibal Locks and Dam near river mile 126 downstream from Pittsburgh, PA,...

OK Menga Hydroelectric Project, Papua New Guinea
The Ok Menga project, currently under construction, consists of a run-of-river intake underground concrete and steel lined power conduit surface powerhouse with two 25 MW units and a 132...

Potential for Upgrading the Robert Moses Niagara Power Plant
This paper summarizes the feasibility of increasing the generating capacity of the Robert Moses Niagara Power Plant by replacing the turbine runners, upgrading the generators, and replacing...

Hydropower Development at North Hartland Lake, Vermont
The purpose of this paper is to give a short history of the first hydropower development by non-Federal interests at a Corps of Engineers flood control dam and reservoir within the jurisdiction...

Small Hydrodevelopment: An Owners Perspective?El Vado, New Mexico Hydroelectric Project
The construction of the El Vado Hydroelectric Project posed several unique problems. The joint ownership of the dam between a Federal and State agency was unique to the region. The proposal...

 

 

 

 

Return to search