Marketing Strategies for Engineers
Engineers face the constant challenge of informing the public and their potential users of their capabilities and the benefits that may be achieved from their services. Marketing...

Managing AutoCAD and Intergraph MicroStation Systems
The reality today is that Computer Aided Design information is being transferred from one CAD system to another. More often, sharing CAD information among the design team requires multiple...

Computerized Approach for Forecasting the Rate of Cost Escalation
This paper reviews the treatment of escalation in construction costs. The causes of escalation are outlined and the effect of escalation on the contractor and the owner is discussed. Various...

Quality Control and Constructability of Slabs on Grade With Expert Systems
Constructability and quality control problems associated with the construction of slabs on grade are many. They vary from problems associated with cracking, scaling, dusting and spalling,...

Civil Engineering Computer Usage Survey
A survey of the members of the Columbia Section of the American Society of Civil Engineers (ASCE) was conducted. The purpose of the survey was to determine the computer usage of practicing...

Framework for an Automated Quality Control System in Working Drawing Production
CAD use for the planning, design, construction and operation of buildings continues to expand at a rapid pace throughout the industry. While CAD applications include a variety of uses...

Total Quality Management for Information Technology
Recently, there has been an increased awareness in the AEC firms toward Total Quality Management (TQM). Many AEC firms and the public sector started to look seriously at TQM. The reason...

Using an Object-Oriented System and a Conceptual Building Model to Represent Architectural Information During Early Design Phases
In this paper we are to present an object-oriented system based on a conceptual building model for handling architectural information during early design phases. This system and model...

The Design and Installation of a Distributed Controls System at the Bissell Point Wastewater Treatment Plant: A Case Study
The Bissell Point Wastewater Treatment Plant is undergoing a $210 million dollar change, which includes a new Distributed Controls System (DCS). The new DCS is being installed in phases...

Order of Magnitude Reasoning for Qualitative Matrix Structural Analysis
Several computational schemes have recently been proposed to adapt Qualitative Reasoning for Structural Engineering applications. One current methodology. Qualitative Matrix Analysis (QMA),...

Development of Differential Growth Method for Automated Vehicle Recognition
The purpose of this study is to improve a system which enables automatic recognition of vehicles from video images using image processing system. Basic methodology is a subtracting operation...

An Application of Fuzzy Set Theory to Preference Analysis in Bus Route Choices
One of the difficulties in applying fuzzy set theory to the real situation is how to determine membership functions. In this study, a questionnaire survey was conducted to assess bus riders'...

Automated Total Quality Management for the Constuction Industry
This paper describes the design of a computer system, called the Total Quality Management system (TQM), to integrate a Quality Assurance (QA) management system with time and resource management...

Building Renovation Decision Support Model
Theoretically, it may be assumed that with proper construction and maintenance the life of a building could be extended almost indefinitely. In practice, however, buildings tend to have...

Optimal Adaptive and Predictive Control System of Buildings by Neural Network and Fuzzy Theory
This paper describes an optimal adaptive and predictive control system and its digital simulations for a single-degree-of-freedom system subjected to earthquake loading. In this system,...

Verification of Real-Time Software for Active Structural Control
In this paper we give an overview of our preliminary work in verifying the reliability of real-time software systems for active structural control. While there have been numerous studies...

Facilities Management System with CAD and Information Control Tools
This paper concerns the establishment of a facilities management (here after referred to as FM) system using ready-made computer software. In general, most so-called FM systems consist...

Managing the Data Explosion
Sound data management practices have always been central to a successful project. However, the data explosion brought on by high-tech electronic sensors and automatic samplers can exceed...

User Identified Short-Term and Long-Term Needs for Pavement Management Innovation
A survey involving 300 practicing engineer's from all over the United States and representing 20 other countries was conducted, concerning ideas and opinions of the priority research needed...

Reliability Assessment of Concrete Pavement Sawing
Traditional concrete pavement design sometimes realize on qualitative decision based on experience, with concrete pavement sawing operations representing a specific case in point. presently,...

 

 

 

 

Return to search