Business Planning for Engineering Projects
Fluor Engineers is a full-service international engineering firm serving the process and energy industries. In conjunction with other Fluor subsidiaries, Daniel Constructors and Fluor...

Technical Training Programs
There is a definite reorientation of the work force in this country. The move to a more technical society has been widely forecast, and despite the valleys and peaks driven by fluctuation...

In-House Training in the Corps of Engineers
The Corps of Engineers is very active in the training of its employees and the results of training are the growth and professionalism of the employees. Supervisors must always develop...

Professional Training Potomac Electric Power Company (PEPCO)
Training of professionals within the Generating Engineering and Construction Group at the Potomac Electric Power Company is most intensive right after hiring but continues to the executive...

Training Programs for Engineering Consulting Firms
Engineering consulting firms heavily use and support in-house training programs. The objectives of these training programs are to: (1) supplement the graduate engineer's educational...

In-House Training Program at J. A. Jones Construction Services Company
This paper offers an overview of the training provided by a construction company located at Hanford, Washington. It posits that attention to the training development of the individual...

Traffic Barriers: A Second Chance
More motorists are killed each year after striking traffic barriers than any other fixed object except utility poles and trees. These deaths occur primarily because the guardrail or bridge...

Enhancing Highway Safety Through 3R Construction
The safety improvement programs specifically aimed at correcting high accident locations (HALs) are certainly helpful. These programs have resulted in sizeable frequency as well as severity...

Non-Freeway Programwide 3R Accident Analysis: New York
The New York Program for restoration, rehabilitation and resurfacing (3R's) has relied on broad scoped projects and case-by-case consideration of exceptions to design standards...

Assessment of Safety Impacts of Highway Projects
In this paper the safety impact of highway improvement and maintenance activities is examined in terms of accident reduction potentials of these activities. There are three causes of accident:...

RRR Design Standards: Cost-Effectiveness Issues
The Transportation Research Board study of geometric design standards for RRR projects is currently trying to match the logic of cost-effectiveness to the mostly judgmental process of...

Delineation Effectiveness for Alcohol Involved Accidents
The approach to the problem of the alcohol impaired drivers to date has been directed at driver education and increased police enforcement. A complementary and parallel approach is presented...

Sighting Safety
This paper examines the interrelation between drivers' visual needs and the road environment. Specific elements of visual limitation and drivers at greatest risk are identified....

An Analysis of Traffic Signal Safety Improvements
Identifying high accident rate locations and determining that they have an overrepresented type or pattern of accidents is an important first step in the safety improvement process. However,...

Location and Development of Safety Projects
Projects to be considered for inclusion in the Highway Safety Improvement Program (HSIP) must be part of a prioritized listing in which each project is based on accident experience or...

Evaluation?A Key to Safer Design Standards
Public highways are designed and constructed in accordance with established standards which have been developed over the years as a result of research studies or developed by committees...

Back on a Full Speed Track
A $30 million rehabilitation project is transforming a Massachusetts rail line that shows its age and poor maintenance history. Rehabilitating the line from Bristol County, Mass. to Hyannis...

Fire on the Water
Incineration is a promising hazardous waste disposal technique. However, nobody wants an incinerator constructed near him, so waste handlers are considering burning hazardous wastes at...

A Critical Look at Building Instrumentation in Earthquake Engineering
This paper discusses different issues and requirements existing in the area of building instrumentation. Strategies and types of equipment currently being used by the United States Geological...

Field Tests of Wind-Structure Interaction
The present study was initiated to investigate the possible causes for excessive lamp failure rates on High Mast illumination towers in the State of Minnesota. The study consisted of two...

 

 

 

 

Return to search