Modeling in Support of Hanford Site Waste Management
The waste management practices for both radioactive and hazardous wastes at the Hanford Site are designed to comply with all applicable state and federal regulations. Results from numerical...

The PowerBargeTM for Lock/Dams on Inland Waterways
Following a brief description of the prefabricated floating PowerBarge concept, the range of application and expected cost and time savings is presented. Environmental benefits are described...

Recirculation Piping Replacement Project at Dresden Unit 3
This paper discusses the Recirculation Piping Replacement Project performed at Dresden Unit 3 during 1985 and 1986. It describes several of the technical and administrative problems associated...

Design, Permitting and Initial Operation of a 32 Mw Agricultural Waste Fired Power Plant
Independent power producers are playing an increasingly important role in satisfying the electric power requirements of public utilities. Many of the independent power producers rely heavily...

The Future of Non-Utility Generation
The business of designing, constructing and operating non-utility owned electric power plants continues to evolve into the 1990s. The industry is consolidating as smaller market participants...

Will The Market in Emission Allowances Work?
The Clean Air Act Amendments of 1990 introduce a major new control program to mitigate the impacts of acid rain. The control program, which has been under debate for approximately a decade,...

Projections for Reduction in Lake Acidification From SO2 Emission Reductions
The Acid Deposition Assessment Model (ADAM) is used to assess the possible range of effects of a national acid rain emission reduction plan on lake chemistry and fish populations in the...

Hydropower in the Upper Ohio River Basin: A Decade of Effort at Risk
The Federal Energy Regulatory Commission (FERC) issued licenses on September 27, 1989 for construction of 16 hydroelectric projects in the Upper Ohio River Basin after up to 8 years of...

Reviewing the History and Activity of FERC
Since passage of the Federal Water Power Act in 1920 (Part I of the Federal Power Act, 16 U.S.C. 791a et seq.), Congress has required those seeking to construct, operate, or maintain hydroelectric...

Environmental Aspects and Compliance Costs of Hydropower Regulation
Recent experiences by American Electric Power with respect to mitigation at hydroelectric project sites on the upper Ohio River indicate that compliance with environmental regulations...

The Changing Legal Structure of Non-Utility Generation in the 1990's
Before actual construction of a small power production or cogeneration facility commences, numerous economic, technical and legal factors have been considered during the planning process....

Facing the 21st Century with an Aging Hydro System
The Tennesse Valley Authority (TVA) has implemented a comprehensive study of their hydroelectric plants in order to extend their service life for the next 50 years into the 21st century....

Brule Project Spillway Rehabilitation and Expansion
Brule Hydroelectric Project is located near Florence, Wisconsin, on the Brule River about 1.5 miles upstream of its confluence with the Michigamme River. The 80 year old dam developes...

Ash Disposal at Coal Creek Station
This paper outlines the effort of two utilities to minimize the impact of an 1100 megawatt lignite fired plant's waste stream on the environment. Current regulations, poor...

Innovative Aspects of the DQE/GPU Project
The DQE-GPU joint project is an endeavor at supplying electricity to its customers in an economically competative way. The project cosists of using existing power stations in the Three...

The Growing Meet Market
The Delaware cities of Dover and Wilmington are only 5 mi apart. Their combined populations barely exceed 100,000. Yet each city is planning to build a new convention center to corner...

Vine Street Reborn
Following decades of controversy and a four-year construction effort that threatened to drive both engineers and local motorists crazy, Philadelphia's Vine Street reopened...

A Computerized Completion
The original designers of the 1.6 million sq ft Fillmore Center in San Francisco (its largest mixed-use development project in 20 years) had specified a large amount of steel reinforcement...

Building Beneath Boston
Up/down construction is a method in which a project's substructure and superstructure are simultaneously built. The substructure's wall, column and foundation...

The Human Factor in Failures
Human shortcomings cause three-quarters of project failures. A study of 500 case histories led to this assumption. One such failure at the Walter Bouldin dam in Alabama, is described in...

 

 

 

 

Return to search