Optimum Life of Equipment for Maximum Profit
Originally published in
Optimizing Haul Fleet Size Using Queueing Theory
Originally published in
Optimum Replacement Life of Large Scrapers
Originally published in
Sensitivity Analysis of Douglas Equipment Life Model
Originally published in
Optimum Size of Hauling Units
Originally published in
Optimum Size of Equipment
Originally published in
Optimizing Capital Investments in Construction
Originally published in
Discussion of
Originally published in
Product Control and Incentives
Originally published in
Project Selection Based on Benefits and Costs
Originally published in
Weather Effects on Mason Productivity
Originally published in
Reward-Risk Ratio
Originally published in
Modeling Method-Productivity
Originally published in
Portfolio Theory: Applications in Construction
Originally published in
Discussion of
Originally published in
Closure of
Originally published in
Pittsburgh's Troubled Bridges: What to Do About Them�
The Pittsburgh area is troubled by old bridges that are badly deteriorated. The metropolitan area has more bridges�� 1,700�� than any other. And some 66 of them have weight limits posted....
$80,000 in Payoffs: An Engineer Tells His Story
A member of ASCE was told that if he wanted public work in a certain area, he would have to pay the County Engineer 25% of the project costs. The engineer decided to pay and has regretted...
What Contractors Think About Prefabricated Piping
Among 190 of the largest users of pipe, 77% now use large-scale prefabricated piping. These users report an average saving, using prefabricated pipe versus conventional pipe, of 23%. Before...
Field Control Replaces Design Conservation At World's Largest Underground Powerhouse
The excavation of 16,000,000 yd� of rock at LG-2, part of the La Grande hydropower project in Canada, has been completed. The world's largest underground powerhouse, with...
Return to search