Rehabilitation of Gravity Wharf by Underpinning
The Municipal Wharf at the Port of Providence, Rhode Island, is currently under rehabilitation to accommodate modern trends in marine cargo handling and shipping. The three-phased project...

Port of Kismayo (Somalia) Rehabilitation
Extensive deterioration of the 2070 ft long four-berth, marginal wharf at the Port of Kismayo necessitated a major rehabilitation to maintain operations. The selected scheme was a steel...

Construction Materials for Civil Engineering Projects
The materials of construction in use today have grown in number, increased in complexity, expanded in application and multiplied in utilization over those in use just a short time ago....

Tiebacks for Bulkheads
Tiebacks were once used primarily to support temporary structures such as supported excavations. However, the use of tiebacks has been gradually expanded to include the support of permanent...

Planning Engineering and Construction Projects
Planning is a recognized element in the success of engineering and construction projects. Two activities at the level of the firm?manpower planning and business planning?also play a major...

Construction Innovation
Demands, Successes and Lessons
Increasing complexity of the constructed product, greater demands for construction cost effectiveness, and foreign competition demand increased innovation in construction. The papers in...

In-House Training Programs
The papers in this book address timely subjects and issues on in-house training programs that are of particular interest to the civil engineering profession. The five papers presented...

Salvaging the Zilwaukee
In 1982, construction of the Zilwaukee Bridge in Michigan was disrupted when the launching truss failed to hold a precast concrete segment near Pier 11N, severely deflecting the cantilever...

The Mile High Dream
For the 1986 Tall Buildings Conference in Chicago, a group of experts studied the implications of a mile high skyscraper to be built of concrete. It is 500 ft square at the base, designed...

Asphalt Pavement Modifiers
Modifiers or additives to asphalt concrete pavements are being researched or marketed by many major chemical firms. Modifiers or additives are used to stiffen the asphalt in hot weather...

CAD Goes into Analysis
In the past, computer analysis of a design was always a separate and distinct step from CAD. Now, an increasing number of systems are combining the two. One system, SSCAD, allows the engineer...

Expert Systems Enter the Marketplace
Civil engineering expert systems (computer programs that incorporate some of the decision-making capabilities of the top experts in a given subdiscipline) are beginning to come on the...

Building with Software
Project management has become a more precise art now that computers are on the construction scene. Scotsman Mfg. Corp. computerized its manual CPM techniques for erecting modular structures,...

Terzaghi Lectures
1974-1982
Sponsored by the Executive Committee of the Geotechnical Engineering Division of ASCE. This Geotechnical Special Publication contains eight lectures...

The Use of Cone Penetrometer Testing to Investigate Sand Fill Subsidence Beneath Highways
During construction of Interstate I-10 between Baton Rouge and LaPlace, Louisiana, highly organic swamp deposits were excavated and replaced with hydraulically pumped river sand. The main...

Cable Stays Catch On
The three completed cable stayed bridges in the U.S.�Pasco-Kennewick in Washington, Luling-Destrehan in Louisiana and East Huntington in West Virginia�will soon be joined by another half...

Designing for Maintainability
Inspection and maintenance guidelines are unavailable for many buildings. Building owners seldom have the benefit of such information because buildings are often considered passive systems,...

Construction by Computer
Olympia & York, the developers of the 8 million sq ft World Financial Center in lower Manhattan are using a computerized scheduling system to keep the flow of materials into the...

Tunnel Ceiling Replaced over traffic
The ceiling of the Holland Tunnel under the Hudson River, connecting New Jersey and Manhattan, was 59 years old and needed replacement, a big job because there are 3 miles of ceiling in...

Postmodern Engineering
Momentum Place is a postmodern skyscraper in Dallas designed by architects John Burgee and Philip Johnson. The Datum-Moore Partnership, structural engineers, designed the structural system...

 

 

 

 

Return to search